

Add to Cart
Excavator Long Boom For Pile Driving
Features
Pile driving steel sheet pile, cement pile, steel rail pile, iron
plate, H steel
Quick converting operation; Applied to various working
environments.
Compared to other systems , less force required for pile pulling
Not damage the top or bottom of steel pipe pile, steel plate pile
and steel rail pile.
Not damage the building even often work near it.
Adopted Rubber sheath to reduce noise and vibration, the operation
is quiet and the working period is short;It is helpful to overcome
environmental problems.
According to the placement direction of sheet pile and site
conditions, the sheet pile can be clamped or lowered by positive
and negative rotation of 180 °. The vibration frequency can be
adjusted by two levels, and the two-level double pumps are combined
to greatly increase the excitation force.
Hydraulic motor has small volume and light weight, but it can
output high power and high speed.
Vibration frequency can be adjusted by variable pump. It can be
used in excavator operation of any brand, and can meet different
work requirements only after changing chucks.
Description
The pile driver have great adaptability to all kinds of terrians
and complicated conditions.Piling boom is widely used in municipal construction, subway,
highway and bridge engineering to reinforce the soil to transfer
load, so as to ensure that the superstructure will not be deformed
anddamaged by the differential settlement of the foundation.
Vibrating pile hammer is using its high frequency vibration to
vibrate pile body with high acceleration to pass the vertical
vibration of mechanical produce to pile which leading to changes in
the soil structure around the pile, strength decrease, soil around
the piles become liquefaction to reduce frictional resistance
between side of the pile and the soil.
Then using the excavator down force, vibrating pile hammer and pile
body weight to sink pile into the soil, when extracting piles, in
the condition of vibration to pull out the pile by using excavator
lift force.
Excitation force needed by pile driving machinery are comprehensive
determined by site soil, soil condition, moisture content and type
of pile, construction.
Efficient of vibration pile method is higher than other methods, it
is mainly applied to steel sheet pile, steel pipe pile and long
slender concrete precast pile within 8 meters.
This pile driving method is the most suitable for working in sand
and poorer effect in the clay which must select higher power model
machines.
Specification
Model | LDB120 | LDB200 | LDB220 | LDB300 | LDB350 | LDB400 | LDB450 |
---|---|---|---|---|---|---|---|
Total Length(mm) | 13000 | 15380 | 15380 | 18000 | 20000 | 22000 | 24000 |
Weight(kg) | 3000 | 4000 | 4200 | 5200 | 6000 | 6500 | 7000 |
Max Digding Depth(mm) | 9000 | 11340 | 11370 | 13000 | 15000 | 16500 | 18000 |
Max Extensive Scope(mm) | 12500 | 15100 | 15100 | 17600 | 19600 | 21600 | 23600 |
Max Digging Height(mm) | 11300 | 12510 | 12610 | 13720 | 14920 | 16100 | 17300 |
Folding Height(mm) | 2900 | 2980 | 3040 | 3210 | 3210 | 3400 | 3400 |
Bucket Volume(m³) | 0.3 | 0.4 | 0.4 | 0.4 | 0.5 | 0.6 | 0.6 |
Excavator Tonnage(ton) | 12 | 20 | 22 | 30 | 35 | 40 | 45 |
FQA
1. ARE YOU A FACTORY OR TRADING COMPANY?
We are a factory based in Guangzhou, China. And we've gained the export certification. Feel free to let our sales know ahead, if you planed for paying a visit to our factory.
2. DO YOU ACCPET OEM? WHAT'S YOUR MOQ? ANY EXPERIENCE FOR OEM?
We accept OEM for every product that we produce; There is no MOQ for any of our product if you wanted a OEM; We've been doing OEM ever since the year we established our factory, which is 2010
3. IS YOUR DELIVERY ALWAYS ON TIME?
We can't promise about the freight but what we can do is shortening our lead time while keep the same quality level. So there will not be any problem even if the sea freight delay for a couple days.
4. WHY DON'T YOU HAVE A CE CERTIFICATIONS?
Ce certification is for one product, not the whole factory, and we have way too many product lines to registered CE for, but our customers from Europe said it's easy to solve the CE problem. And we are working on the CE certifications registration process, in order to save our customers' time in the furture.
5. HOW AM I START ORDERING?
First, talk to our sales about your machine medel, working
conditions, special needs, deadlines. Then, our sales will provide
the details you need. All inquiry will be responed within 24 Hours.
6. CAN YOU KEEP ME UPDATE ABOUT MY ORDERS' PRODUCTION PROCESS?
Of course, unlike others who might hide their production process,
our production process are totally open for our customers. Feel
free to inform our sales about your needs.
Tag: long reach boom, long reach arm, excavator long boom