

Add to Cart
Ore Clarification Tailing Thickener 2m-5m Depth For Gold Recovery
The main features are:
(1) Increase the degassing tank to avoid solid particles adhering
to the bubbles, which is like a "parachute" sedimentation
phenomenon.
(2) The feeding pipe is located below the liquid level to prevent
gas from being brought in during feeding.
(3) The feed shaft is moved down, and there is a receiving pan to
make the slurry fall evenly and steadily, effectively preventing
the phenomenon of overpressure caused by the mine;
(4) An internal overflow weir is added to make the material flow
according to the prescribed stroke and prevent the phenomenon of
"short circuit";
(5) The overflow weir is changed into a sawtooth shape, which
improves the suction phenomenon of local drainage caused by the
non-level overflow weir;
Name | Ore Clarification Tailing Thickener 2m-5m Depth For Gold Recovery |
Model | Tailing Thickener |
Purpose | Gold Recovery |
Appearance and main parameters:
Model | Bridge structure | Angle | Diameter φ | Depth H | Inlet port | Overflow | Mud outlet | Motor Power |
α m m kw | ||||||||
NXZ-09 | Full bridge | 8° /9.5. | 9 | 2.5 | DN100 | DN100 | DN80 | 4 |
NXZ-12 | 12 | DN150 | DN150 | DN100 | ||||
NXZ-15 | 15 | 3 | DN200 | DN200 | DN150 | |||
NXZ-18 | 18 | 3.5 | 5.5 | |||||
NXZ-20 | 20 | DN250 | DN250 | DN200 | ||||
NXZ-24 | 24 | |||||||
NXZ-30 | 30 | DN300 | DN300 | DN200 | 7.5 | |||
NXZ-35 | 35 | |||||||
NXZ-38 | Half bridge | 6°+12°/9.5° | 38 | 3.5 | DN400 | DN400 | DN250 | 11 |
NXZ-40 | 40 | |||||||
NXZ-45 | 45 | DN500 | DN500 | DN300 | 15 | |||
NXZ-55 | 53 | |||||||
NXZ-60 | 60 | DN600 | DN600 | DN350 | 22 |
Application areas:
The high-efficiency thickener is a series of products introduced
with foreign advanced technology. It adopts a brand-new mechanical
structure to strengthen the flocculant's coagulation of solid
particles. It mainly includes several supporting systems:
flocculant addition system, degassing tank and automatic control
system . At the same time, the central feed well is enlarged to
reduce the dispersion distance of solid particles and enhance the
denseness effect.
The high-efficiency thick conveyor is widely used in
hydrometallurgy, mineral processing plants, chemical plants,
aggregate plants and other production sites that require
solid-liquid separation, with a diameter of 5~100m and a depth of
2~5m.
Company introduction
Tangshan Mine Machinery Factory is a specialized manufacturer that produces complete sets of equipment for metallurgy, mining, building materials, environmental protection, as well as the design and manufacture of complete sets of sand and gravel materials, and the design and manufacture of dry tailings discharge. The company was founded in 1971 and turned into a joint-stock enterprise in 1997.
The company occupies more than 50 acres, with total assets of 90 million yuan and more than 200 employees, including 96 engineering and technical personnel.
Various processing and testing equipment: 8 meters, 5 meters, 4 meters vertical lathes, 8 meters, 5 meters, 3.15 meters gear hobbing machine, 6 meters planer, precision boring machine, medium frequency quenching and other larger processing equipment and automatic welding, ultrasonic welding More than 300 sets of flaw detectors, W15-23 material testing machines, aging vibration devices, etc.
The main products are: various models and specifications of Jinma brand crushers, ball mills, classifiers, magnetic separators, dewatering screens, linear screens, screening machines, feeders, vertical roller mills, etc.
Among them, 17 products have obtained national patents. Among them,
the crusher and ball mill have won many national honors.
The products are sold all over the country and exported to Russia, Mongolia, South Korea, Chile and other international markets.
FAQ to save your precious time!
Q1: Hi, are you a mining machinery manufacturer?
Answer: Yes, we are a professional manufacturer of mining machine.
Our company welcomes customers to visit our factory at any time.
Q2: How long is the warranty period of your equipment? Does your
company provide spare parts?
Answer: The warranty period of our machine is one year. For those
wearing parts, we guarantee to provide high-quality parts for a
long time.
Q3: How long does it take to deliver?
Answer: Production usually starts after receiving the advance
payment. Small machine is guaranteed to be delivered within one
month. Large-scale machine is guaranteed to be delivered within 2-3
months.
Q4: Do you provide machine operation guidance?
Answer: Yes. We have professional engineers for installation,
commissioning and operation guidance.