

Add to Cart
100-300mm Inlet Double Roller Crusher Machine
Introduction
The MPG series sealed pair roller machine is an equipment for
special industries such as rare earth materials, metal oxides,
charge alloys and metal silicon. It has high energy utilization,
fine and uniform crushing particle size, and can be adjusted within
a certain range. Especially it has good sealing performance of the
whole machine.
Name | 100-300mm Inlet Double Roller Crusher Machine |
Inlet size | 100-300mm |
Model | Double Roller Crusher Machine |
Application
This machine is mainly suitable for the crushing of various solid
brittle materials with compressive strength not greater than 250Mpa
and feed size not greater than 5mm. It is widely used in many
special industries.
Parameter
Item Model | MPG-400×250 | Unit |
Roller Size | Φ400×250 | mm |
Feed Size | -5 | mm |
Discharging Size | -10~-40 | mm |
Production Capacity | 500~1500 | Kg/h |
Roller Speed | 120 | r/min |
Feed-type | electromagnetic vibration | |
Power | 4,4 | kw |
Outline Size | 1390×800×2200 | mm |
Weight | 1000 | kg |
Company introduction
Tangshan Mine Machinery Factory is a specialized manufacturer that produces complete sets of
equipment for metallurgy, mining, building materials, environmental
protection, as well as the design and manufacture of complete sets
of sand and gravel materials, and the design and manufacture of dry
tailings discharge. The company was founded in 1971 and turned into
a joint-stock enterprise in 1997.
The company occupies more than 50 acres, with total assets of 90
million yuan and more than 200 employees, including 96 engineering
and technical personnel.
FAQ to save your precious time!
Q1: Hi, are you a mining machinery manufacturer?
Answer: Yes, we are a professional manufacturer of mining machine.
Our company welcomes customers to visit our factory at any time.
Q2: How long is the warranty period of your equipment? Does your
company provide spare parts?
Answer: The warranty period of our machine is one year. For those
wearing parts, we guarantee to provide high-quality parts for a
long time.
Q3: How long does it take to deliver?
Answer: Production usually starts after receiving the advance
payment. Small machine is guaranteed to be delivered within one
month. Large-scale machine is guaranteed to be delivered within 2-3
months.
Q4: Do you provide machine operation guidance?
Answer: Yes. We have professional engineers for installation,
commissioning and operation guidance.