PUF Foaming Table Solar Water Heater Production Equipment

Brand Name:BABYSUN/OEM
Certification:CE/ISO
Model Number:BS-MACHINE
Minimum Order Quantity:1
Delivery Time:21-28 Workdays
Payment Terms:T/T, L/C, Western Union, MoneyGram, D/P, D/A
Contact Now

Add to Cart

Active Member
Location: Jiaxing Zhejiang China
Address: No.4 Factory, No.16 Jinshi Road, Jianshan New District, Haining, Jiaxing City, Zhejiang Province, China
Supplier`s last login times: within 48 hours
Product Details Company Profile
Product Details

HP-12G PUF Hydraulic and Pneumatic Foaming Table

Product: Solar water heater PUF foaming table

Application: When used for water tank foaming, internal and external water tank positioning.

Description: FP12G Hydraulic and pneumatic foaming table

The workbench of solar water heater PUF foaming table adopts hydraulic lifting type, which can automatically lock the function of the countertop when it is in position. The inner and outer barrel fixing method use the cylinder to drive the foaming mold to fix the inner and outer barrels. The inner and outer barrels are positioned accurately and quickly, which is the ideal equipment for the inner and outer barrels of the water tank foaming fashion clip. At the same time, it can also function as a buckle.

Parameter of solar water heater PUF foaming table:

Tank Max. Length3000mm
Tank DiameterCustomized
Stand Number8
Power4.0KW
Voltage380V 50HZ
Air Pressure0.5Mpa—0.8Mpa
Labor4
Max.Efficiency160pcs/per 8 hour
Weight1500kg
Size (L*W*H mm)4300*1800*4800

Solar water heater production machine

(1) Time of Shipment: Effect shipment will be around 75-90 days after receiving the 30% advance payment.

(2) Terms of payment: TT at sight (pay 30% advance payment by TT before production, the rest 70% must be paid after seeing the copy of BL by TT).

(3)Acceptance Certficate: The machine acceptance test will be made in the sellers factory at the presence of the buyers technicians for the production. Once the quotation standards reached an acceptance certificate will be signed by both parties and the machine shall be considered accepted.

(4) Guarantee Period: In correct operation&maintaing, the machine is guaranteed for one year from the date of BL date. During the guarantee, it is free for spare parts; after the guarantee, you have to buy new parts if the spare parts are broken. All the machines are piovided with whole-life service.

(5)Installation&Training (Optional)
After the machines arrived at destination, the seller will send 1 technician to the buyers factory to install the machines and trainning the workers at the buyer 's written request.
Installation and trainning period: 7 working days.
The buyer needs provide some technicians to assist the work, solve the language problem of the technicians of the seller. Before installation, the buyer should prepare coil sheet and hydraulic oil and the foundation for positioning the machine.
Installation labor charge: 150USD/DAY
In addition the buyer pays seller's technicians travel cost outside china (including roundflight fee), accommodation and foods(at least three-star hotel with air condition), provide transportation from hotel to the work place. necessary communicaton and insurance etc.
The buyer should pay the above fee in advance.


China PUF Foaming Table Solar Water Heater Production Equipment supplier

PUF Foaming Table Solar Water Heater Production Equipment

Inquiry Cart 0