

Add to Cart
KYSJ00 Spray Tunnel pasteurization machine
Main structure and characteristics
The body of the Kysj00 Spray pasteurization is made of SUS304 stainless steel. The specific structures and features are as follows:
1. The overall width of the machine is 2000mm, the length is
determined according to the product output and customer process
requirements, the height is determined according to the product
height, and the import and export seal design. The chain net and
comb plate are imported PP materials with high strength, high
temperature resistance of 115 degrees, and will not be stretched
during operation. The thickness of the chain network is 24.6mm. It
adopts the straight-line segmented cross-support form to ensure the
smooth operation of the chain network, no jitter, and no swing. The
height of the chain net is adjustable from 1000 to 1100, and the
running speed of the net belt is adjustable from 0 to 1000 mm/min.
2. The main frame is 100X50X2 and 50X50X1.5 high-quality SUS304
stainless steel pipes, the inner box is made of high-quality SUS304
stainless steel plate with a thickness of 2mm, and the upper cover
is 1.5 mm high-quality SUS304 stainless steel plate. The spray
header on the upper part of the spray adopts industrial grade
stainless steel seamless pipe to prevent bursting when the pressure
is too high.
3. The nozzle is made of SUS304 stainless steel, the diameter of
the nozzle hole is 3mm, it is non-clogging, acid and alkali
resistant, and high temperature resistant. The nozzles are evenly
distributed to ensure that the bottle and the water evenly contact.
4. The inlet of the pump is connected with the water collection
tank outside the box (the water collection tank uses a square
stainless steel flange and is connected to the lower part of the
side of the tank with screws), and the water in the water
collection tank is installed before the pump is filtered by two
layers of screens.
Product properties
1. Production capacity: | optional according to customer requirement |
2. The height from the chain net of the spray sterilizer to the ground: | H=1050±50mm |
3. Rack height: | Determined according to bottle height |
4. Frame length: | effective length +1600mm (according to customer process requirements) |
5. Rack width: | 2000mm |
6. Compressed air source: | 0.8Mpa |
7. Air consumption: | 0.05m3/min |
1. The whole machine is usually divided into heating and heat preservation zone and cooling zone. The heating method is generally direct injection heating.
2. Equipped with a control box, touch control panel can display:
real-time spray temperature, real-time chain network operating
speed, real-time deceleration motor operating frequency and other
parameters (optional). It is convenient for workers to control the
equipment.
3. The equipment is equipped with cleaning manholes and overflow
ports to facilitate personnel to enter the equipment to clean and
remove equipment residual liquid. The equipment is equipped with
manual main water supply port and automatic auxiliary water supply
port.
4. The box body has a window to observe the production operation. A
float level gauge is installed on the water tank to facilitate
automatic level detection and control.
5. The spray sterilizer is distributed with spray pipeline and
steam pipeline, standard steam configuration, pipeline including
filter, pressure reducing valve, diaphragm proportional regulating
valve, steam bypass, etc.
FAQ:
Q1: How could I choose the right packing machine?
A: We have various item of packing machine to suit for pack different materials(products), just let me know your product and requirement, we will choose the suitable item and make a drawing for you to confirm. Also your customize design are availbale, we have more than 10 person engineers team and R&D team.
Q2: What's your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q3: What is your terms of delivery?
A: EXW, FOB, CFR, CIF
Q4: How about your delivery time?
A: Generally, it will take 30 to 40 days after receiving your
advance payment. The specific delivery time depends on the items
and the quantity of your order.
Q5: Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery