

Add to Cart
China High Capacity Quary/Basalt/Granite/Gold/Stone/Rock Cone Crusher
Feature
Cone crush is a major device used in metallurgy, construction materials, chemical industry, hydropower, road construction and other industrial sectors for secondary crushing and fine crushing of all kinds of ores and rocks with varying hardness, especially for the secondary crushing and fine crushing in dressing plants.
Cone crush is a major device used in metallurgy, construction materials, chemical industry, hydropower, road construction and other industrial sectors for secondary crushing and fine crushing of all kinds of ores and rocks with varying hardness, especially for the secondary crushing and fine crushing in dressing plants.
PYT series cone crusher is a kind of spring cone crusher and has three types according to the different needs of crushing: standard type (B) suitable for secondary crushing of ores; medium type (Z) suitable for secondary and fine crushing of ores; and shorthead type (D), suitable for fine crushing of ores. It can meet the needs of secondary crushing and fine crushing of all kinds of ores or rocks with varying hardness.
Working principles of cone crusher:
The cone crusher for sale is mainly composed of frame, fixed cone
assembly, movable cone assembly, spring mechanism, bowl pedestal
part, transmission device and so on, and the auxiliary device
includes electrical system, diluted oil lubrication station and
hydraulic cleaning chamber system. When Cone crusher works, the
motor drives the drive shaft through the pulley and V-belt .The
drive shaft and a pair of bevel gear make the eccentric sleeve
rotating and this makes the cone axis swing, so sometimes the
crushing wall is near the rolling mortar wall, but sometimes they
are far away from each other. Stones in the crushing cavity are
extruded, impacted, and boned continuously, finally they are
crushed.
Parameter
Specifications | Feed inlet size | Max. Feed size | Adjusting range of discharge opening | Production capacity | Cone base diameter | Eccentric shaft speed | Main motor | |||||||
Models | Models | Power | Rotating speed | Voltage | Number of spring sets | Total pressure of spring | Cooling water consumption | Mass (not including motor) | ||||||
mm | mm | mm | t/h | mm | r/min | kw | r/min | v | t | m³/h | t | |||
PYT-B0607 | 75 | 65 | 12-25 | 40 | 600 | 355 | Y250M-8 | 30 | 730 | 380 | 8 | 5-40 | 1.2 | 5.2 |
PYT-D0604 | 40 | 36 | 3-13 | 44188 | ||||||||||
PYT-B0913 | 135 | 115 | 15-50 | 50-90 | 900 | 333 | Y315S-8 | 55/60 | 720/1500 | 380 | 10 | 7-70 | 3 | 23.6 |
/4135T-1 | ||||||||||||||
PYT-20907 | 70 | 60 | 5-20 | 20-65 | Y315S-8 | 23.4 | ||||||||
PYT-D0905 | 50 | 40 | 3-13 | 15-60 | /4135T-1 diesel | 24.3 | ||||||||
PYT-B1217 | 170 | 145 | 20-50 | 110-168 | 120 | 300 | Js126-8 | 110 | 735 | 220/380 | 10 | 150/15 | 3 | 23.6 |
PYT-21211 | 115 | 100 | 8-25 | 42-135 | 23.4 | |||||||||
PYT-D1206 | 60 | 50 | 3-15 | 18-105 | 24.3 | |||||||||
PYT-B1725 | 250 | 215 | 25-60 | 280-430 | 1750 | 245 | Js128-8 | 155 | 735 | 220/380 | 300/25 | 6 | 50 | |
PYT-21721 | 215 | 185 | 10-30 | 115-320 | 50 | |||||||||
PYT-D1710 | 100 | 85 | 5-15 | 75-230 | 49 | |||||||||
PYT-B2235 | 350 | 300 | 30-60 | 590-1000 | JSQ1510- | 3000/6000/10000 | 16 | 400/25 | 6 | 78.9 | ||||
PYT-22227 | 275 | 230 | 10-30 | 200-580 | 2200 | 200 | 12/JSQ15 | 280/260 | 490/485 | 80.6 | ||||
PYT-D2213 | 130 | 100 | 5-15 | 120-340 | 8-12 | 80.6 |
Why choose our company machine?
Q1: Hi, are you a mining machinery manufacturer?
Answer: Yes, we are a professional manufacturer of mining machine.
Our company welcomes customers to visit our factory at any time.
Q2: How long is the warranty period of your equipment? Does your
company provide spare parts?
Answer: The warranty period of our machine is one year. For those
wearing parts, we guarantee to provide high-quality parts for a
long time.
Q3: How long does it take to deliver?
Answer: Production usually starts after receiving the advance
payment. Small machine is guaranteed to be delivered within one
month. Large-scale machine is guaranteed to be delivered within 2-3
months.
Q4: Do you provide machine operation guidance?
Answer: Yes. We have professional engineers for installation,
commissioning and operation guidance.