High Quality Rod Mill Machine for Mining Industry, Ore Rod Mill Machine
Introduction
Ball mill is a critical device for smashing after the materials are
crushed. Ball mills are widely used in manufacturing industries of
cement, silicate products, new construction materials, fireproofing
materials, chemical industry, ore dressing of ferrous and
non-ferrous metals and glass ceramics, etc for grounding of various
ores and other grindable materials. Generally, overflow ball mills
are suitable for high grinding fineness while grid ball mills are
suitable for low grinding fineness. (Unfavorable impacts of over
grinding on grading can be avoided)
Paremeter
Models and specifications | Specifications of tube (mm) | Rotating speed of tube (r/min) | Feed particle size (mm) | Discharge particle size (mm) | Handling capacity (t/h) | Power (kw) | Weight (kg) | |
Diameter | Length | |||||||
MBS0918 | 900 | 1800 | 36-38 | ≤25 | 0.833-0.147 | 0.62-3.2 | 18.5 | 4600 |
MBS0924 | 900 | 2400 | 36 | ≤25 | 0.833-0.147 | 0.81-4.3 | 22 | 5100 |
MBS1224 | 1200 | 2400 | 36 | ≤25 | 0.833-0.147 | 1.1-4.9 | 30 | 12000 |
MBS1530 | 1500 | 3000 | 29.7 | ≤25 | 0.833-0.147 | 2.4-7.5 | 75 | 15600 |
MBS1830 | 1830 | 3000 | 25.4 | ≤25 | 0.833-0.147 | 4.8-11.6 | 130 | 28000 |
MBS2130 | 2100 | 3000 | 23.7 | ≤25 | 0.833-0.147 | 14-35 | 155 | 34000 |
MBS2136 | 2100 | 3600 | 23.7 | ≤25 | 0.833-0.147 | 19-43 | 180 | 37000 |
MBS2430 | 2400 | 3000 | 21 | ≤50 | 0.833-0.147 | 25-65 | 245 | 54000 |
MBS2736 | 2700 | 3600 | 20.7 | ≤50 | 0.833-0.147 | 32-86 | 400 | 86000 |
MBS2740 | 2700 | 4000 | 20.7 | ≤50 | 0.833-0.147 | 32-92 | 400 | 94000 |
MBS3245 | 3200 | 4500 | 18 | ≤50 | 0.833-0.147 | 64-180 | 800 | 137000 |
Why choose our company machine?
Q1: Hi, are you a mining machinery manufacturer?
Answer: Yes, we are a professional manufacturer of mining machine.
Our company welcomes customers to visit our factory at any time.
Q2: How long is the warranty period of your equipment? Does your
company provide spare parts?
Answer: The warranty period of our machine is one year. For those
wearing parts, we guarantee to provide high-quality parts for a
long time.
Q3: How long does it take to deliver?
Answer: Production usually starts after receiving the advance
payment. Small machine is guaranteed to be delivered within one
month. Large-scale machine is guaranteed to be delivered within 2-3
months.
Q4: Do you provide machine operation guidance?
Answer: Yes. We have professional engineers for installation,
commissioning and operation guidance.