

Add to Cart
Wellhead Joint Wireline Pressure Control Equipment Alloy Steel
I. Overview
The wellhead joint is used to connect the blowout preventer and the
wellhead, the upper part is connected with the blowout preventer,
and the lower part is connected with the wellhead.
The wellhead joint is sealed by threads. When in use, wrap the PTFE
tape on the thread or apply anti-sticking grease on the thread, and
then screw the wellhead joint directly on the thread of the
wellhead.
II, pressure test:
Wellhead joints should be subjected to regular compression strength
tests, and the test pressure is 1.5 times the working pressure.
1. Install the pressure test connector and connect the pressure
test pipeline;
2. Start the pressure test pump for pressure test: press to the
test pressure, keep the pressure for 15 minutes without leakage,
and fill in the test record card.
III, daily maintenance:
1. The withstand voltage test should be carried out regularly;
2. When not in use temporarily, you should bring the protective
wire for storage.
Welcome to contact us at any time.