Fasteners Rail Anchors For Durable And Secure Track Installation

Brand Name:Gnee Rail
Certification:ISO
Model Number:50Kg, 85Kg,90/91LB, 115RE /136RE ,UIC54 & UIC60 rail
Minimum Order Quantity:1 Tons
Delivery Time:30 days
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Verified Supplier
Location: Anyang Henan China
Address: 25th Floor, Huafu Commercial Center, Wenfeng District, Anyang City,Henan Province
Supplier`s last login times: within 36 hours
Product Details Company Profile
Product Details

Rail anchors are used for fastening systems where additional anti-creep arrangements are required. Anchors are made of rolled steel bars of varying cross-sections and in various shapes. When pushed into the track, the rail anchors firmly grip the track and when setting sleepers, resist the longitudinal movement of the track caused by passing trains.


Rules for the application of rail anchors


The rail anchor should be located on the gauge side of the rail base against the same tie face on the opposing rail.

The rail anchor must hold the rail base tightly and securely and fully support the rail tie face.

When the bearing of the rail anchor to the tie is disturbed, a new rail anchor and rail tie will be required.

The rail anchor cannot be moved by driving along the rail.

When applying the anchor, the rail should be kept straight.



Rail anchors specifications


Type

Used in 50Kg, 85Kg,90/91LB, 115RE /136RE ,UIC54 & UIC60 rail, or other types upon customers' drawings.

Material60Si2MnA45#QT500-7
Chemical composition(%)

C:0.56-0.64, Mn:0.60-0.90, Si:1.60-2.00, Cr:≤0.35, P:≤0.03, S:≤0.03



C:0.42-0.50, Mn:0.50-0.80, Si:0.17-0.37, Cr:≤0.25, P:≤0.035, S:≤0.035

C:3.60-3.80, Mn:≤0.6, Si:2.50-2.90, P:≤0.08, S:≤0.025
Surfaceplain (oiled),color painting, zinc painted or HDG
StandardAS1085.10-20002 , DIN, ISO-9001

Proper maintenance and replacement of track anchoring devices is also critical to the long-term stability and safety of railroad tracks. Track anchors should be inspected periodically for signs of wear, damage, or looseness. Any loose or damaged track anchors should be replaced immediately to prevent accidents and ensure track stability.

When performing maintenance and replacement of track anchoring devices, the following steps should be taken:

Periodic inspection of track anchors: Track anchors should be inspected periodically for signs of wear, damage, or looseness. These inspections should be performed at least once a year and more frequently in high traffic areas.

Replace damaged or loose track anchors: Any loose or damaged track anchors should be replaced immediately to prevent accidents and ensure track stability. Rail anchors that no longer fit tightly to the rail bed should be moved and re-hammered or replaced.

Maintain proper torque: During installation and replacement, track anchors must be tightened according to the manufacturer's specifications. Correct torque ensures that track anchors are held firmly against the track base and provide the necessary stability and security.



Gnee Rail has been specialized in producing rail anchors for many years. We can customize them according to customer requirements and have sold them to many countries. Welcome to purchase them.

China Fasteners Rail Anchors For Durable And Secure Track Installation supplier

Fasteners Rail Anchors For Durable And Secure Track Installation

Inquiry Cart 0