Multi Socket Box 380V 220V 63A Panel Power Distribution

Brand Name:ABLPOWER
Model Number:SP-10A
Minimum Order Quantity:4-49 Units
Delivery Time:5-15 Working days
Payment Terms:Western Union, T/T
Place of Origin:Guangdong, China
Contact Now

Add to Cart

Active Member
Location: Guangzhou Guangdong China
Address: 3 / F, No.8, Nanyang South Street, Chadong Village, Shiji Town, Panyu District, Guangzhou City, Guangdong Province, China
Supplier`s last login times: within 28 hours
Product Details Company Profile
Product Details

High Quality Industrial Mobile Waterproof Electrical Distribution Box Combination Multi Socket Box IP65 63A


Product Description
High quality Midium Distribution Board supplied with fire-resistance PE material with installation of different standard sockets & plug and MCB(RCD) protection as customer actual need.
Standard Color: Yellow and Black (Other color supplied as need with available quantity)
1. With handle design at TOP side for easy carrying and moving.
2. Lock and screw design at 4 corners of upper cover for convenient installation and open.
3.Empty distribution board box also can be supplied as need.

Features:

In put:63A 3P+N+E 380V.

Out put:socket 16A 2P+E 220V by 10 chennels.

MASTER SWITCH:DZ47 40A 3P

Switch:DZ47 16A 1P x 10

IP 65 waterproof

customer configurations available.



Company Information

Packaging & Shipping

FAQ

Question 1:Is this the final price?

Answer:Under normal conditions already the best price.If the exchange rate changes, we will make adjustments in time.

Question 2: What kind of packing can you provide?
Answer:We will use carton packaging for power timing device products, color neutral without any product LOGO. Distribution cabinet products are packed in airmail boxes or cartons. Of course, if you have special requirements, we can also pack the products according to your requirements, the cost is calculated separately.
Question 3:What are your payment terms?
Answer:T/T is 30% of the deposit, and pay 70% of the balance before delivery. Before you pay the balance, we will show you the pictures of the products and packaging.
Question 4:How long will it take to finish production?
Answer:Generally speaking, distribution cabinet products need 5 to 10 days after receiving the advance payment. The exact delivery time depends on the items and quantity of the order. The power timing device will be produced in 3-10 days, we will negotiate the details.
Question 5:Can we produce according to the sample?
Answer:Yes, our company supports customization, so we can produce through your samples or technical drawings. We also have our own technical designers.
Question 6:Do you accept custom orders?
Answer:You can. Our company is an OEM manufacturer, so we welcome custom orders. We will customize it according to your requirements.
Question 7:What is our company's advantage over other companies?
Answer:Our company has always been a audio industry power products manufacturers, including:
1. The production of various types of portable distribution box;

2. Power timing device;
3. Specialized in producing peripheral products of power supply;
4.HIFI power cable.

China Multi Socket Box 380V 220V 63A Panel Power Distribution supplier

Multi Socket Box 380V 220V 63A Panel Power Distribution

Inquiry Cart 0