

Add to Cart
For EPDM Rubber Strip, Rubber Hose Extrusion Line, Automatic Hot Air Tunnel
Rubber strip, hose production line extruding process is including
many machines, as cold feed rubber extruder, automatic hot air
tunnel, cooling tank, roller traction machine, duplex winding
machines and other equipments. This production line has the
advantage of labor, effort and energy-saving, environmental
protection and high capacity etc.
Features:
Automatic Hot Air Tunnel adopts automatic thermostat temperature
control system which has character of fast heating and high
production efficiency etc.
1. Electric heating tube heating, temperature range as the room
temperature to 260ºC, the entire line automatic thermostat, and
temperature control accuracy of +/-2ºC.
2. Effective length of the vulcanizing box generally is 26 meters.
It liner with 120stainless steel and the middle insulating layer is
fully filled with aluminum silicate cotton.
3. Vulcanization box is divided into three zones, each zone with
trimmer potentiometer which adjusts the speed of the three zones of
vulcanizing box to equilibrium; in the middle of each zone with the
ventilating device, and removing the emissions generated by the
vulcanization process in time in order to ensure the smoothness of
the rubber products.
4. Cooling tank is used to cool high temperature rubber seals and
then use high-speed airstream drying them.
5. The entire production line speed is adjustable to match with
speed of the extruder.
Parameter:
Electrical Tube Heating Power | 24KW |
Heating Temperature | 180~270℃ |
Effective Curing Length | 9000mm |
Hot Air Circulating Fan Power | 0.75KW |
Transmission Speed | 2~28m/min |
Center Height | 1050±30mm. |
Conveyor Belt Width | 180mm |
Motor Power | 0.75KW, adopts frequency control and adjust speed, inverter is Delixi brand |
Insulation | 1.5mm thickness stainless steel, insulation thickess is 100mm |
FAQ:
1. What does your factory do regarding quality control?
We pay much more importance to quality control from the very
beginning to the end of production. Every machine will be fully
assembled and carefully tested before shipment.
2. What's the machine quality guarantee?
Quality guarantee time is one year.We choose world famous brand
components to keep our machine in perfect working condition.
3. Are you able to give installation and commissioning overseas?How
long time will it take?
Yes, we can supply overseas service and technical support but
customer needs to pay for the cost of the installation. Small
machine usually takes within 2~3 days. Big production line usually
takes about 30 days.
4. How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed
and confirmed in the order. The core of our company culture is
innovation,quality,integrity and efficiency. Also we have had many
good cooperation with world famous rubber production manufacturers.
If you come to our factory, we can show the user around us.
5. How can we go to your side?
We are located in Qingdao City, Shandong province, China. The name
of airport is Qingdao liuting airport. We will pick up you at the
airport.
Our Services:
♦ Our engineers can design target machines for customers and send
them the drawing to confirm. We are always on the side of saving
your cost.
♦ In the process of production, we will take photos and send to
customers for their track the progress.
♦ Documents such as packing list, commercial invoice, and bill of
lading etc. will be sent after the delivery.
♦ We could supply free English foundation DWG, installation
drawing, user guide, maintenance manual and part drawing.
♦ We supply overseas engineer service and help to train your
workers to operate the machine.