

Add to Cart
Batch off Cooler, Rubber Batch off Units, Rubber Sheet Batch off Cooler XPG-700
1. The rubber batch-off cooler can be designed as a floor
construction or an over-head construction. The sheet can be output
on the first floor or on the second floor or both the first and the
second floor.
2. The rubber batch-off cooler is a conbined construction. Customer
can add or reduce the middle support as required.
3. Customer can select the transverse strip cutter and the strip
slitter according to the processing requirements.
Model | XPG-600 | XPG-600 | XPG-800 | XPG-900 | |
Max. Rubber Sheet Width (mm) | 600 | 600 | 800 | 900 | |
Rubber Sheet thickness (mm) | 4-10 | 2-12 | 4-10 | 6-12 | |
Temperature over room temperature after rubber sheet cooling (℃) | 10 | 10 | 15 | 5 | |
Linear Speed of taking-in conveyor (m/min) | 3-24 | 3-24 | 3-35 | 4-40 | |
Linear speed of sheet-hanging chain (m/min) | 0.82 | Chain-belt layer: 5 | 0.117-1.17 | 4-40 | |
Hanging height of the sheet hanging bar (m) | 1000-1500 | Net | 1000-1500 | 1400 | |
No. of cooling fans (set) | 12 | 20 | 18-26 | ||
Total power (KW) | 13.7 | 28.8 | 18-34 | ||
Overall Dimension(mm) | L | 1425 | 16800 | 26630 | |
W | 4500 | 4700 | 3500 | ||
H | 3405 | 3520 | 5630 |
FAQ
1. Delivery time of the rubber machines?
This is specially designed machine according to your specific
requirement.
From engineer designing to production completion, it needs about 25
to 35 days.
2. What does your factory do regarding quality control?
We pay much more importance to quality control from the very
beginning to the end of production.
Every machine will be fully assembled and carefully tested before
shipment.
3. What's the machine quality guarantee?
Quality guarantee time is one year.We choose world famous brand
components to keep our machine in perfect working condition.
4. Are you able to give installation and commissioning overseas?
How long time will it take?
Yes, we can supply overseas service and technical support but
customer needs to pay for the cost of the installation.
Small machine usually takes within 2~3 days.
Big plant usually takes about 30 days.
5. How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed
and confirmed in the order.
The core of our company culture is innovation, quality, integrity
and efficiency. Also we have had much good cooperation with world
famous rubber production manufacturers. If you come to our factory,
we can show you're the user around us.
6. How can we go to your side?
We are located in Qingdao City, Shandong province, China. The name
of airport is Qingdao Liuting airport.
We will pick up you at the airport.
Packaging
Equipment painting completed before delivery, and then wrapped with
stretch film, avoid rubbing the paint off the surface, wooden
packaging can be customized, key parts, such as electronic control
box, will be wrapped by shockproof packaging materials, and then
packed in wooden cases.