

Add to Cart
ABS Straight Handle 3/8''X1/2'' Shower Stop Valve Replacement
Shower Stop Valve Replacement Introduction
Ease-of-use Push-fit connection, no soldering, clamps,or glue needed
Can be used on copper tubing, CTS, CPVC and PEX
Hi-Flow tube stiffener included for PEX tubing
Strong, corrosion resistant, durable body made of Lead Free brass
Certified for use in hydronic heating and potable water.
Items | Descriptions |
Material | PVC-U , PPR,CPVC,PP |
Products | Pipelines for water supply and drain ,Female and male Coupling ,Socket, Cap , Tee , Adapter , Elbow , Reducer, Union , Plug , Pipe Clip , Valve , Plastic Tap and Mould |
Size | 1/2 –8'' 20-200mm |
Standard | ASTM D2466, ASTM D2846 ,ASTM D2665 , BS4346, NBR5648, NBR5688,DIN8078 / 8077, |
Machines | injection machines |
Colors | white ,gray , green ,ivory , brown |
Working place | PVC -15°-60°, PPR-20°- 95°,CPVC-20°-110° |
Warranty | at least 50 years |
Delivery time | 30-40 days |
We have a mould workshop also we can make mould |
Shower Stop Valve Replacement Picture
Product Description
Instant Push-Fit connection for increased ease-of-use.
No soldering, clamps, unions, or glue required.
Fittings certified to 200 PSI and 200°F (93°C).
Fits copper tubing, and CTS CPVC and PEX and connects all three
types in any combination.
Integral tube liner for PEX installations, sono loose components,
ensures secure, reliable connection.
Design certified and agency listed.
Compact, robust LEAD FREE brass body. Foundation of a strong,
corrosion resistant, durable fitting.
Design certified to ANSI/NSF-61 and ASSE 1061 product standard for
use in potable water and hydronic heating water distribution.
Approved to be used underground and behind walls without access
panels.
Designed for hydronic heating as well as potable water
distribution.
Details
FAQ
Q. Are you a factory or a trading company?
A: We are direct factory, our production line includes all brass,
stainless steel copper and aluminum products or according to your
requirements
Q. How long do I need to get the product sample for inspection?
A: For samples in stock, we can send them to you immediately. If it
need make new samples according to your specifications, it will
take about 15 working days
Q. What is the time of delivery?
A: If the items is in stock, we can deliver within 7 days after
receiving your payment For customized orders, within 20tons,
production time is 40-45 days after confirmation of each detail
Q. How to control the guarantee of product quality?
A: We have an independent laboratory, whose operating standard is
EN13828
We carry out comprehensive quality inspection from raw materials to
every link Meanwhile, our company has PICC insurance and we have a
3-year quality guarantee. At the same time our company has a lot of
certification, such as Iso9001
TS, CUPC, NSF, AB1953, CSA, CE and ACs, etc
Q. Is there any MoQ for product orders?
A: The MoQ for each product is negotiated separately and sample
inspection can be conducted
Q. How to deal with the unqualified products?
A: Our products are produced under A strict quality control system
For batch unqualified products, please contact us. Our company will
conduct technical research and test according to the problems, and
give you a timely solution according to the corresponding situatio