

Add to Cart
Yellow End Caps 1/2" Copper Push Fit Fittings
Yellow End Caps Introduction
cUPC,NSF61,AB1953 approved
Certified to 200psi (13.79bar ) and 200°F (93 °C)
Note: JinQuan Fittings are available for higher temperatures,
pressures.
Connects Copper,PEX and CPVC... pipe in any combination.
Pex Stiffener for PEX pipe only..
Approved for use underground and behind walls without access
panels.
Yellow End Caps Specification:
Product Name | Yellow End Caps 1/2" Copper Push Fit Fittings |
Material | C45600 |
Imperical Size | 1/2"x1/2"x1/2" 3/4"x3/4"x3/4" 1"x1"x1" |
Free sample | Acceptable |
Best offer | Factory price |
Logo | As customer requiry |
Used | household,agricultural use,industry use |
Color | Nature color or yellow |
Yellow End Caps Pictures
Installation
Select the correct size fitting and pipe for the job. Check that
fittings and pipe are clean, in good condition and are free from
damage and foreign objects.Cut the pipe so that the ends are
square.Ensure that there are no burrs or damage to the cut end.Once
the pipe end is cut square and clean,use a permanent marker to mark
the insert depth on the outside of the pipe.This mark is used to
ensure that the joint is assembled correctly.To assemble
correctly,the pipe needs to be pushed into the fitting untill it
meets the tube stop.Follow these three steps to insert the pipe
into the fitting.
1.lnsert the pipe through the release collar against the grab ring.
2.Push the pipe firmly with a slight twisting action until it
reaches
the tube stop.
3.To ensure that the pipe is correctly inserted, check that the
depth
mark is within 0.005 in (0.13 mm) of the end of the release collar.
Disconnection of the joint can only occur by using the PUSHLOCK
removal tool.By applying pressure to the release collar with the
re-
moval tool, the grab ring teeth are splayed.This action releases
the pipe, allowing it to be removed from the fitting.
1.Place the PUSHLOCK removal tool around the pipe with the non-
branded face against the release collar.The end with the size dis-
played on the removal tool should be positioned around the pipe and
the other end around the neck of the fitting.
2.Push the removal tool against the release collar and pull the
pipe
with a twisting action to release the pipe.
3.Check the fitting and pipe end for damage.The fitting and pipe
should be free of damage, foreign objects and marks on the outside
diameter. If the pipe is damaged or marked, then cut and use a new
section of pipe.
about us
Originally founed in1983,TaiZhou JinQuan Copper Inc. is one of the
leading
manufacturer of lead free plumbing valves&fittings, mainly
serving plumbing
wholesalers,distributors and retailers.
We are currently supplying lead free PEX
fittings&Valves,push-fit fittings&Valves,
Various water supply stops and water connectors etc.All products
are made of
lead-free with DZR functional brass,and have been certified and
listed by IAPMO.
Our goal is to help our customers to increase their profitability
and gain more market
share by taking advantage of our extremely competitive price and
quality.
FAQ
Q: Can l get samples from your factory?
A:Samples available,We usually provide existing sample for free.But
Express Fee is needed.
lf you have UPS/DHL... account,We can use your account.For existing
samples, it takes 1-2 days.
lf you need your own designs, it will takes 7-10 days,Cause we need
make new MOULD.
Q: What is your MoQ? Can l order small amount ?
A:Usually our MOQ is 1,000pcs.To take a good start,We accept any
quantity for your trial order.
Pls feel free to tell us which Item,Size,Quantity, So that we can
make Pl for you,
Wish your business boom and place larger orders in the future.
Q: What is your payment term?
A: Normally,T/T 30% down payment,balance to be paid before
shipment.or L/C.
After cooperate 2-3 times,We will know each other,Will cosider your
ideal payment term then