Intelligent Control 50000hrs 200w Led Parking Lot Light

Brand Name:JOINT LIGHTING
Certification:CE,ETL,FCC
Model Number:JNT03-ALS
Minimum Order Quantity:2Pcs
Delivery Time:5-6 Work Days
Payment Terms:D/P, T/T, D/A
Contact Now

Add to Cart

Active Member
Location: Xiamen Fujian China
Address: No. 268 Houxiang Rd, Xinyang Industrial Park, Haicang District, Xiamen City, Fujian, China
Supplier`s last login times: within 47 hours
Product Details Company Profile
Product Details

200W/240W/300W LED Shoebox Light/Parking Lot Light With Screw Captured ETL Approved


  • Construction  IP 66 Die cast housing  Sleek low profile design low EPA rating        
  • Finish
    Corrosion resistant polyester
    Standard colors:Dark Bronze
    Customized colors are available
  • Mounting
    Standard mounting
    diameter is 2 3/8” (60mm)
    10 mounting optional
    DAM for round pole and square pole
  • Anti-Condensation Valve
    Release pressure to
    prevent moisture buildup

Specifications


FinishDark Bronze/Gray/Black/White/Customized colors are available.
LED DriverMeanwell Inventronics
ControlPhotocell/Montion Sensor/Intelligent control
MountingOne Person Installation
Fixture Weight:5KG-9KG
Application:Auto Dealership/Parking Lot/Educational Facility/Commercial Exterior/ Industrial Facility Security Area/Site Pathway Area
Working life-span>50,000H
Freqency range50HZ-60HZ
Input Voltage(V):100-277V / 277-480V
Light DistributionType2/Type 4/Type 5/Type5
DesignLego Module Assemble
Surge ProtectionSurge protection 10KV build in,20KV Optional
Lamp Power (W)200W/240W/300W

FAQ


Q1: What is terms of packing?

Generally, we pack our LED Shoebox Light in standard cartons. If you have legally registered patent, we can pack the goods in your branded boexes after getting your authorizations letters.


Q2: What is your terms of payment?

T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages


Q3: What is your terms of delivery?

FOB, CFR, CIF, DDU.


Q4. How about your delivery time?

Generally, it will take 3 to 25 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.


Q5. Do you test all your goods before delivery?

Yes, we must have 100% test before delivery.


China Intelligent Control 50000hrs 200w Led Parking Lot Light supplier

Intelligent Control 50000hrs 200w Led Parking Lot Light

Inquiry Cart 0