350 Meters 92kw Crawler Mounted Drill Rig Yuchai Engine Large Pneumantic

Brand Name:SHITAN
Certification:CE ISO
Model Number:ST-350
Minimum Order Quantity:1 set
Delivery Time:7-10 days
Payment Terms:T/T, Western Union
Contact Now

Add to Cart

Verified Supplier
Location: Jinzhou Hebei China
Address: Xiaoshang Village,Jinzhou City,Hebei province,China
Supplier`s last login times: within 2 hours
Product Details Company Profile
Product Details

350 Meters 92KW Yuchai Engine Large Pneumantic Crawler Mounted Drill Rig


ST 350 Crawler Mounted Drilling Rig Introduction


It is hydraulically driven by diesel engine. The dashboard is simple and clear. It is a crawler mounted structure, which is easy to move. Steel crawler chassis is adopted (of course, you can also choose rubber crawler to facilitate walking on urban roads). Four standard high legs .


ST 350 Crawler Mounted Drilling Rig Tech Data


Drilling Rig ModelST 350 Drilling Rig
Drilling depth350m
Dia.holeφ140-325mm
Advance Length one time6.6m
Working pressure1.7-3.0MPa
Air consumption17-35m³/min
Length of rod1.5m,2m,3m,6m
Dia. Of rodφ76, φ89,φ102,φ114
Lifting power24T
Rotation torque8500-11000N.m
Rotation Speed40-70r/min
Diesel EngineYuchai
Engine Power92Kw/2200rpm
Travelling speed0-2.5 Km/h
Climb capacity30°
Weight9500kgs
Dimension6000x2200x2900mm
ApplicationComplicated geological conditions:Rock,Mud,Sand etc.
Drilling WayTop drive hydraulic rotary and propulsion,Dth Drilling or Mud Pump Driling
Dth Hammer4",5",6",8",10" Drill hammer or CIR110, 130, 150,170

ST 350 Crawler Mounted Drilling Rig Features


(1) High slag discharge wind speed, clean hole bottom and no secondary crushing; Because there is no liquid column pressure, the hole bottom crushing condition is improved without groundwater;
(2) The drilling method of pneumatic water well drilling rig is to impact the hole bottom with high frequency, which reduces the influence of hole inclination on rock or inclined stratum, so as to improve the verticality of drilling hole and reduce the rock collapse of hole wall;
(3) Compared with rotary well drilling rig, pneumatic well drilling rig requires much less WOB and torque. This can reduce the quality and capacity of drilling equipment and create favorable conditions for large-diameter hard rock drilling;
(4) Pneumatic water well drilling rig has good adaptability and can work under various complex rock strata (including aquifer);


Water Pump Attention


After the well is completed, measure the water level of the water outlet well and the corresponding water output according to the drainage condition of the drilling machine, and then determine the total head of the water pump according to the height difference from the ground to the dynamic water level and the irrigation method you adopt, and the required working head of the water pump. The flow of the water pump shall not exceed the water flow through the well.


The maintenance of water well drilling rig needs to be carried out regularly


I. maintenance of filter element:

The filter element plays the role of filtering impurities in the oil or gas circuit, preventing them from invading the system and causing faults; Various filter elements should be replaced regularly according to the requirements of (operation and maintenance manual); When replacing the filter element, check whether there is metal attached to the old filter element. If there are metal particles, timely diagnose and take improvement measures; Use the pure filter element that meets the requirements of the machine.

II. Lubricating grease Management:

The use of lubricating oil (grease) can reduce the wear of the moving surface and prevent noise. When the grease is stored, it shall not be mixed with dust, sand, water and other impurities; Lithium grease G2-L1 is recommended, which has good anti-wear performance and is suitable for heavy load conditions; When filling, try to squeeze out all the old oil and wipe it clean to prevent sand adhesion

III. fuel management:

Choose different brands of diesel oil according to different ambient temperatures; Diesel oil cannot be mixed with impurities, ash and water, otherwise the fuel pump will wear out prematurely; The high content of paraffin and sulfur in inferior fuel will damage the engine; After daily operation, the fuel tank should be filled with fuel to prevent water droplets on the inner wall of the tank; Open the drain valve at the bottom of the fuel tank to drain water before daily operation.



China 350 Meters 92kw Crawler Mounted Drill Rig Yuchai Engine Large Pneumantic supplier

350 Meters 92kw Crawler Mounted Drill Rig Yuchai Engine Large Pneumantic

Inquiry Cart 0