Gy 200 Portable Borehole Drilling Machine Crawler Mounted 400 Meters Depth

Brand Name:JINZHOU SHITAN
Certification:ISO9001
Model Number:Gy 200
Minimum Order Quantity:1 set
Delivery Time:7-12 days
Payment Terms:T/T, Western Union
Contact Now

Add to Cart

Verified Supplier
Location: Jinzhou Hebei China
Address: Xiaoshang Village,Jinzhou City,Hebei province,China
Supplier`s last login times: within 2 hours
Product Details Company Profile
Product Details

Gy 200 Crawler Mounted Portable Borehole Drilling Machine 400 Meters Depth


GY 200 Hydraulic Borewell Machine


It is a light multifunctional engineering project prospecting drilling rig,with 300 meters depth and 300mm hole diameter, It was designed for geologic structure prospecting of industrial and civil constructions.


GY 200 Hydraulic Borewell Machine Technical


Drilling depth60 225 295m
Drilling hole diameter300 76 46mm
Pipe rod diameter50 42mm
Spindle Turnable Angle0-360degree
Net weight(excluding the power machine)670kg
Dimension(length*width*height)1820*980*1400mm
Revolving Plate
Spindle speed900 475 388 205 157 68 r/min
Maximum torque2000N*m
Driving travel400mm
Maximum Cylinder driving force2,9000N
Maximum Cylinder lifting force3,9000N
Lifter
Lifting capacity3,0000N
Bobbin line speed (2 layers)0.27 0.64 0.83 1.58 1.64 m/s
Bobbin diameter135mm

GY 200 Hydraulic Borewell Machine Advantages


1.Wide range if P.R.M and well-set gears

2.Great torque in low P.R.M, fit for coring drilling and piling hole works.

3.Mobile cylinder installed so that the drilling machine got a free travel of 300mm, ensured easy remove of drilling stem.

4.Easy to handle, high efficiency, oil hydraulic drive, low labour intensity.

5.With light single derrick cell, the derrick can be dismantled and handled easily and safely.


GY 200 Hydraulic Borewell Machine Application


1.1.1 engineering geological survey of railway, hydropower, transportation, bridge, dam foundation and other buildings.

1.1.2 geological core drilling and physical survey.

1.1.3 drilling of small grouting holes and blasting holes.

1.1.4 small water well drilling


How are the drill pipes in the well drill connected?


The water well drilling rig can be used only after all parts are firmly installed and connected before being used for drilling.

The following are the relevant operation steps of adding and connecting the drill pipe of the water well drilling machine:

Operation of well drilling machine when adding drill pipe

1. When the depth of one drill pipe needs to be connected after drilling, stop the propulsion first, then stop the rotation, and turn off the cooling water;

2. Operate the clamping handle to make the gripper clamp the drill pipe and open the micro regulating flow valve (right rotation);

3. The rotator reverses, and at the same time, retracts the feed oil cylinder to rotate the water braid shaft away from the drill pipe;

4. Stop the rotation and operate the fast forward and backward handle to the fast backward position to make the chuck quickly return to place;

5. Connect the drill pipe to be added to the previous drill pipe, and the rotator moves forward while rotating. When the trapezoidal conical thread of the water braid shaft is in screw contact with the conical thread of the newly added drill pipe, immediately operate the gripper handle, loosen the gripper and complete the drill pipe addition.



China Gy 200 Portable Borehole Drilling Machine Crawler Mounted 400 Meters Depth supplier

Gy 200 Portable Borehole Drilling Machine Crawler Mounted 400 Meters Depth

Inquiry Cart 0