

Add to Cart
Industrial 5 Kg/H Pope Ethanol Vacuum Evaporator Falling Film
This falling film evaporator is widely used in the concentration of chemical, ketchup, glucose, starch sugar, oligosaccharide, caramel, sorbitol, fresh milk, fruit juice, vitamin C, maltodextrin, pharmaceutical and other aqueous solutions. Besides, it is also widely used in the waste liquid treatment of monosodium glutamate, alcohol, fish powder and other fields.
The equipment is continuously operated under vacuum and low
temperature conditions, with high evaporation capacity, energy
saving and consumption reduction, low operating cost, and it can
maintain the original color, aroma, taste and ingredients of the
processed materials to the maximum extent. It is widely used in
many industries such as food, medicine, food deep processing,
beverage, light industry, environmental protection, chemical
industry and other fields.
The evaporator can be designed into different process flow
according to the characteristics of different materials to be
processed, and can also be equipped with automatic control system
according to the requirements of different users.
Name | Electric heating single effect falling-film evaporator |
Model | LXQX - 5-00 |
Evaporation capacity | 5kg/h |
Total power | 18kw |
Cooling water consumption | 1T/h (inlet 25°C, outlet 35°C) |
Boundary dimension | 1600x900x2600mm |
Equipment configuration list | heater, evaporator, feed pump, vacuum pump, condenser, equipment support, material pipeline, etc. |
Working Theory
This glass falling film evaporator belongs to liquid film
concentration equipment, which has high heat transfer rate and
short heating time. It applies to chemical, liquid medicine, juice,
and dairy production.
The theory is that the feed liquid is added in the middle of the
evaporation chamber. Under the action of vacuum and gravity, the
accelerating pressure head of the liquid is smaller than that of
the rising film type, and the boiling point is also smaller. The
temperature difference between the electric heating and the feed
liquid is large, so the heat transfer effect is better.The steam
enters the evaporative separation chamber for separation. The
secondary steam is discharged from the top of the chamber and the
concentrate is extracted from the bottom.
Operation Process
1. The first step is to remove the gas in the equipment to create a
vacuum environment and after the vacuum degree is enough, feed
water in replacing materials. When water is running smoothly (the
water in the evaporator increases with the increasing in walk,
surface evaporation indoor materials are not higher than sight
glasses), open circulating pump, cooling water is piped in, start
the heating tube and start the discharge pump. After the equipment
runs well, adjust throttling components in each position according
to the the random process flow chart of the equipment. Then replace
the material with water for running. When the vacuum degree and
temperature difference meet the requirements, replace the material
with water for running for more than 4 hours. It is qualified if
the evaporation capacity meets the requirements; otherwise, adjust
the throttle element again.
2. Firstly start the vacuum pump. If it is a water ring vacuum
pump, the water ring vacuum pump should be started at no load.
After the water ring vacuum pump is running normally, the working
water valve of the water ring pump is opened. When the vacuum and
temperature difference of each effect reach the required level,
water should be used instead of the material to start the operation
and start the condensate. After the water is cut off, the material
is put into the material tank. The sampling valve is initially
opened, the water is discharged, and the material that does not
meet the concentration requirement is placed in the tank. When the
discharge concentration requirement is reached, the discharge valve
is opened, and the sampling valve on the material tank is closed,
and the equipment is put into normal operation.
3. During the operation of the pump and before starting, it should
be observed that the cooling water of the mechanical seal of the
pump must not be interrupted, so as not to damage the mechanical
seal of the pump.
4. When the work is to be stopped, water is used instead of the
material to replace the materials in the equipment and its piping
to prevent the material from crystallizing or solidifying in the
equipment and its piping. When the ambient temperature of the
equipment is below 0 °C, the water in the equipment and its
pipeline should be drained to avoid freezing or blocking the
pipeline.
5. When parking due to accidents such as sudden power failure,
immediately close the valve, release the materials stored in the
equipment and its pipeline as soon as possible, or dilute the
heated water until it does not crystallize or solidify. When there
is material in the equipment and its pipeline, the material pump
should be started first to make the material run smoothly when
starting the vehicle, and then the vacuum pump is started.
6. During the operation, if the degree of vacuum is low, especially
after restarting after accidental parking caused by power failure
and so on, immediately find out if there is leakage at the flange
and the joint, and block the leak in time.
7. The cleaning of equipment:After the equipment is finished, the
equipment and its pipelines are washed and cleaned with water, 1-2%
NaoH aqueous solution, clean water, 1-2% HNO3 aqueous solution and
clean water. The pump is pumped with the above washing liquid, and
each washing liquid should not be less than 10 minutes.
The equipment should not be washed by using hydrochloric acid or
hydrochloric acid chloride-containing aqueous solution during
scouring or cleaning to avoid intergranular corrosion of stainless
steel equipment and affect the service life of the equipment.
Care and Maintenance
1. Always check whether the oil cup of the pump is short of oil,
and whether the cooling water in the mechanical seal is broken.
2. Always check the flanges and joints of the equipment for air
leakage.
3. When the mechanical seal of the pump is damaged, it should be
replaced in time.
4. When the check valve rubber ball and rubber gasket are damaged,
they should be replaced in time.
5. If the indications such as thermometer, vacuum gauge, pressure
gauge, etc. are inaccurate, they should be proofread or replaced in
time.
6. The surface of the equipment should not be rubbed with a hard
scrubbing tool (such as steel brush) to avoid scratches and
scratches on the stainless steel surface.
Pre-sale Service
1. Provide 24-hour technical consulting reply;
2. Provide professional quoted price;
3. Provide detailed product performance specification;
4. According to product’s using condition, technicians will offer
rationalization proposals to assist clients to select proper
product types;
5. Provide other corollary equipment according to client
requirements.
In-sale Service
1. Begin to supervise from raw material, its qualified rate can
reach to 100%;
2. Whole manufacturing process are in strict accordance with
promised procedure requirements, product qualified rate can reach
to 100%;
3. Provide product’s inspection record of key junctures to
customers;
4. Provide production schedule photos to customers at regular
intervals;
5. Package and transport products strictly accordance with export
standard;
6. Provide transportation schedule information to clients timely.
After-sale Service
1. Provide targeted installation video;
2. Under the premise of correct installation, normal maintenance
and using, we guarantee one-year warranty period;
3. When warranty period has expired, our sold products enjoys
lifetime guarantee repair, we only charge cost price for changing
product’s standard component and sealing component;
4. During installation and adjustment period, our after-sale
service staff will communicate with customers frequently to know
product’s running state in time. Assist customers to install and
adjust products until customers are satisfied;
5. If product has malfunction during operation period, we’ll offer
you satisfied answer in time. We’ll reply you within 1 hour and
provide solution or send staff to spot within 24 hours after
receiving maintenance notification;
6. Lifelong free technical support. Conduct satisfaction survey and
inquiry equipment running condition to clients by telephone or
e-mail semiannually from the first day of equipment running, put on
records of acquired information;
7. Provide assistant service if product is damaged during
transportation.