0.75 Ton / Hour 3mm Fertilizer Plant Equipment Melting Pot

Brand Name:Huaqiang
Certification:ISO CE
Model Number:DYG1.0
Minimum Order Quantity:1 set
Delivery Time:10-15 working days
Payment Terms:L/C, T/T, Western Union
Contact Now

Add to Cart

Verified Supplier
Location: Zhengzhou Henan China
Address: South of road, 500 meters westward of crossroad of Gongye Road and Tonghang Wu Road, Shangjie Disctrict, Zhengzhou City,Henan Province, China
Supplier`s last login times: within 48 hours
Product Details Company Profile
Product Details

0.75 Ton Per Hour Professional Melting Pot In Compound Fertilizer Process

Introduction of 0.75 Ton Per Hour Professional Melting Pot In Compound Fertilizer Process

The melting pot is made up of frame, shell, mixing system, heating device, measuring system and power distribution cabinet. After the heating system is started, the liquid is input, the position of the liquid surface is observed, the motor of the mixing system is started to drive the rotating blade so that the temperature of the liquid can be fully mixed to achieve the ideal effect, and it is convenient for the delivery of the metering pump. According to the actual situation, adjust the metering pump knob.

Structure and working principle of 0.75 Ton Per Hour Professional Melting Pot In Compound Fertilizer Process

This melting pot is made up of racks, enclosures and mixing systems. Heating device. Metering system power distribution cabinet composition. After starting the heating system, input the liquid, pay attention to observe the liquid surface position, start the mixing system motor drive stirring blade rotation so that the temperature of the liquid is fully mixed to achieve the desired effect, easy to measure the pump delivery. The flow size adjusts the metering pump knob according to the actual situation.

Features of 0.75 Ton Per Hour Professional Melting Pot In Compound Fertilizer Process

1. The temperature in the melting tank: 110 -- 125 ℃, the upper limit of automatic control is set as 115 ℃, and the lower limit is set as 105 ℃.

2. Concentration in the melting tank: 95%

3. The upper limit and lower limit of the automatic liquid level in the melting tank are set at 85% and 80%, respectively.

4. The heat preservation steam pressure of urine pipeline: 0.25-0.28mpa.

5. Heating steam pressure in the melting tank: 0.5-0.8mpa.

6. The temperature of the material in the granulator is 60-65 ℃, the moisture content of the material after granulation is 3%, and the particle size at the outlet of the granulator is 2-3mm.

7. Dryer inlet temperature: 130 -- 150 ℃, outlet temperature: 60 -- 70 ℃

Parameter of 0.75 Ton Per Hour Professional Melting Pot In Compound Fertilizer Process

ModelDriving PowerHeating PowerHeating AreaMetering PumpPower

Quality(T)


DYG1.0XWD5-3KW18(12)KW1.7m2ZRJM2-0.80.37KW0.75

FAQ

1. Are you a manufacturer or trade company?

We are the professional fertilizer machine manufacturer for producing the organic fertilizer machine and compound fertilizer machine.
2. How long is the delivery time and guarantee?
Usually, our delivery time is 15-20 days. Warranty for 12 months without artificial and deliberate damage.
3.Whether I can customize a different machine?
Yes, we have our own professional fertilizer machine designing team, we can supply the customized service for different customers and production requirements.

China 0.75 Ton / Hour 3mm Fertilizer Plant Equipment Melting Pot supplier

0.75 Ton / Hour 3mm Fertilizer Plant Equipment Melting Pot

Inquiry Cart 0