Recycled 6005 T6 2mm Multi Function Support Aluminium Template Profiles

Brand Name:Goomay
Certification:ISO9001:2015 , ISO14001:2015 , ISO45001:2008
Model Number:GM-JZMB-11
Minimum Order Quantity:MOQ 2000KGS For Initial Order,the quantity could be negotiable
Delivery Time:After drawings confirmed,4-7days moulds ready , after samples approved , 7-10days delivery for 200TONS
Payment Terms:30%deposit+70% against BL copy, D/P, L/C
Contact Now

Add to Cart

Verified Supplier
Location: Langfang Hebei China
Address: No.6 Xietong RD.,Shengfang Furniture Industrial Park,Bazhou City,Langfang,Hebei Province,China P.C.:065702
Supplier`s last login times: within 10 hours
Product Details Company Profile
Product Details

Aluminum Alloy Multi-function support , aluminium profiles for building formwork


Description


We have adopted a more advanced system. The strength and rigidity of aluminum alloy formwork system are improved by optimizing the section of aluminum alloy formwork and surface powder coated treatment.


So, you will be able to purchase higher quality products at a lower price.


Product Parameters


Product NameAluminium Template Profiles, Building Formwork Profiles
MaterialChina Alminium Origin Ingot 6005-T6 , 6061-T6More toughness
Surface TreatmentMill Finish , Anodized SilverHigh corrosion resistance
CharactersLight Weight, Easy-Installation, RecycledSave time and manpower
CertificatesISO9001:2015 , ISO14001:2015 , ISO45001:2008National quality certification
ApplicationConcrete Construction , Real Estate Construction

Aluminum alloy formwork system


Panel system:


It is made of extruded aluminum alloy profiles (6061-T6, etc.), which is light, high-strength, and good in integrity, so as to ensure convenient installation and repeated turnover of horizontal plates.


Supporting system:


Single support: adopt advanced early dismantling technology support system to ensure that the construction period of each layer structure is controlled within the range of 4 ~ 5 days. Through test verification, the vertical allowable bearing capacity reaches 20 ~ 25KPA.


Bidirectional bracing:


Realize the three-dimensional adjustment function, while ensuring the verticality and flatness of the vertical members (walls, columns), it can strengthen the horizontal rigidity and bearing capacity of the vertical members (walls, columns) to resist the lateral direction caused by pouring concrete pressure.


Fastening system:


Within the range of conventional storey height (2.8 ~ 3.2M), the back flute system adopts the design principles of locally strengthening 4 parts of inner wall, 5 parts of outer wall, openings and floating platforms, etc., so as to ensure the formwork system Overall strength, stiffness and stability.


Attachment system:


Pins, pins, bolts and other hardware accessories are made of high quality products, performance and processing accuracy in accordance with the relevant specifications and customer requirements.


Construction advantages



1. Good system integrity


The overall casting is sub-molded, and the structure is safer.



2. High construction efficiency and short construction period


Only one set of template is needed for the early mold removal system.



3. Good construction quality


High quality of concrete molding: verticality, flatness, horizontality, and high precision of section size.
The concrete surface has a good look and feel: it achieves the effect of fair-faced concrete without plastering.


4. Reduce the use of vertical transport machinery


Except for the first formwork going upstairs and the last time going downstairs, lifting equipment is used, all subsequent manual transfers are used.



5. Solve the shortage of skilled workers on the construction site


The installation is simple, and the general workers can carry out the installation of aluminum formwork after simple training.


6. Safe and civilized construction


The support system is simple and convenient, with large working space on site, personnel movement, smooth material handling, and clean and safe construction surface.

There is no construction waste, no need to store and clean up, and the construction site is easy to manage.


Economic benefits


The biggest cost advantage of the aluminum alloy formwork system is that it can be reused many times. At present, the standard template has been used more than 300 times. Damaged templates can be recycled and re-cast.


At the same time, due to the high molding quality of the aluminum template, it can achieve the effect of plaster-free turbulence, saving a lot of cement, sand, water and mortar production, transportation and plastering labor costs, and its economic benefits as the number of repeated use increases The manifestation becomes more obvious.



Reduce wood consumption and protect forest resources.


The aluminum alloy formwork can be used repeatedly for many times. After being damaged, it can be returned to the furnace and remelted. All of them are reused, which greatly reduces the waste of wood.



Save the use of river sand and protect water and land resources.


Due to the high forming quality of the aluminum alloy template, the effect of avoiding plastering can be achieved, and a large amount of cement, sand, water and mortar production, transportation and plastering labor costs are saved.



Caring for life and paying attention to safety.


Achieve safe and civilized low-carbon construction and reduce site safety accidents.



Improve efficiency and reduce energy consumption.


The use of aluminum alloy formwork has high construction efficiency and reduces energy consumption in building construction.


China Recycled 6005 T6 2mm Multi Function Support Aluminium Template Profiles supplier

Recycled 6005 T6 2mm Multi Function Support Aluminium Template Profiles

Inquiry Cart 0