

Add to Cart
Professional Coating Equipment Steel Profile Spraying Room Coating Paint Spray Booth
Pretreatment system
The pretreatment method is divided into liquid processing and dry
processing.
Hanna offers you reasonable and economical pretreatment methods to
clean your workpiece.
According to the product size, different processing forms can be
selected, the structure is reasonable and the ideal use effect can
be achieved.
Depending on the quality and type of metal, different cleaning and
pre-treatment methods should be considered. You should also be
aware of the results you want to achieve and the requirements of
your customers. The most common types of metal cleaning and
pretreatment are water washing, degreasing, pickling, phosphating
and sand blasting.
The washing in various stages of pre-treatment will have a major
impact on the quality of the entire pre-treatment. If the cleaning
is not clean, it will produce: 1. residual acid, phosphating
liquid, flocculation of the resin in the paint liquid, stability
deterioration; 2. Residual foreign matter (oil, dust), shrinkage,
granules and other defects in the paint film; 3. Residual
electrolytes and salts cause increased electrolysis reactions and
pinholes,etc
Maint Process
1 | Pretreatment: Dipping pretreatment with overhead crane, or fully automatic spraying pretreatment |
2 | Conveying system: light closed-circuit conveyor, power and free conveyor, overhead open conveyor, and so on |
3 | Oven: batch oven, hot air circulating drying oven, tunnel oven, bridge drying oven |
4 | Spray paint room type :Water spray paint room; Water spray paint room; Dry spray paint room; spray paint room |
5 | Control system: Switch style or PLC control, with or without touch screen |
How to choose coating equipment
1. The size and weight of workpiece,especially the max size and
weight
2. Is there any requirements about the suspension of the workpiece?
3. The material of the workpiece
4. The anticipative output for the biggest size of the
workpiece(how many pcs in 8 hours)
5. The length,width and height of the factory available for the
powder coating line
6. The heating power:Liquefied Petroleum Gas, Liquefied natural
gas,diesel,or electric?
7. Do you need to change colors every day? How many colors do you
have in total?
8. Do you need automatic painting or manual painting?
9. Do you need pre-treatment process? If you do,you want spray
pre-treatment or bath pre-treatment?
Online pre-treatment or offline pre-treatment?
10. The local electricity conditions(_V/_Phase/_Hz)
11. Do you have any special requirements about the package?
If you have any other requirement,please feel free to communicate
with us.
About Us:
JingzhongJing(JZJ) Group company was set up in 1999,now is a large
comprehensive company which
specialies in the design,manufacture,sales,service for
Pre-treatment,Painting lines and Exhaust Gas
treatment equipments.
Main Product:
Spray booth/Preparation room/Water testing line for
Car/Bus/Truck/Train/Boat/aircraft ect;Sand Blasting
Room/Shot Blasting Room/Power Coating/Painting line,Exhaust
gas(Vocs treatment equipment for all kind
of Industry Product ect.
Two Produce Base:
China South Produce Base (In Guangzhou,Since 1999)
China North Produce Base (Jiangsu,Since 2007)
Some of our Project.
----------------------------------------FAQs-----------------------------------------
Are you Trade company or manufacturer?
We are the manufacturer with export liscence.We have two factory in
Guangzhou and in Jiangsu,China.
How can we cooperation?
How can we cooperation?
1. Turn Key Project:
Our company will be responsible to help you to do the production
line desing,manufacturing,installation,
debugging and your personnel trainging jobs,Also we will provide
you one-stop service for your
production facilities procurement.
2. Equipment Supply:
Our company will not only provide you the equipments,but also will
offer you the onsite installation
instruction and guidance as well.
3. Other coopeation style.
Keep flexible and discuss.
How about after sale serivce?
1. Provide technical support and production line upgrade
2. Feedback withini 12h after receive fault notification or service
requirement
3. Free training on the user’s manual
4. User-friendly English manual or operation video for machine
using and maintanence.
5. On-the spot trainging and installation can be met if required.
6. On time delivery.
7. One Year Gruantee.