Marine Lost Wax Casting Parts Alloy Steel Plug

Brand Name:OEM service available
Certification:ISO 9001
Model Number:OEM service available
Minimum Order Quantity:100 Units
Delivery Time:4-8 weeks
Payment Terms:T/T, L/C, D/P
Contact Now

Add to Cart

Site Member
Location: Ningbo Zhejiang China
Address: No.2 Yinhe River, Fenghua District,Ningbo
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

Marine Parts High Quality Investment Casting Marine Boat Parts Of Plug Made In China


1. Products Information:

NameMarine Parts High Quality Investment Casting Marine Boat Parts Of Plug Made In ChinaMaterialAlloy Steel
WeightKGApplicationMarine Industry
PriceUSD/KG2.5-3CurrencyRMB USD EUR
Surface treatmentBlackenProcessLost Wax Investment Process
Payment terms50%mould and clamp cost in advance when do the sample, after sample approved, pay 50%balance. Pay50%deposit when the order played, and after see the copy of B/L.pay 50% balance.PackingNon-Fumigation Plywood box/ Also can do according to customer's requiement.
Terms of TradeEXW FOB CIFDrawingJPG,PDF,STP,IGS,CAD
Delivery Time60days for sample making,45 days for mass production

2. Manufacturing Process:


Process design⇒ Tooling making Wax injection Wax pattern assembly Mold preheat Wax removal Stuccoing Dipping Casting Mold shake out Work piece cut-off Grinding Heat treatmentMachining Final inspection Pack& transport


3.Quality Insurance

Spectrograph Spectrum Analyse Chemical Analyse

Tensile Machine&Hardness Machine Shaping Machine Simple Hardness Test Machine


4.FAQ

a . How to contact with your company?

Please send email to us or chat on line

b . What does your company need to submit a quotation?

Drawing or sample, together with relevant information, such as quantity, weight, material.

c. Which kind of format of the drawing?

PDF, IGS, DWG, STEP, etc

d . What if we do not have a drawing?

We can duplicate your sample and make drawing for your confirmation.

e. How soon before I get a sample?

weeks for mold and sample, 3-7 days for express.


5.Welcome customer from Abroad and domestic to send the inquiries.

China Marine Lost Wax Casting Parts Alloy Steel Plug supplier

Marine Lost Wax Casting Parts Alloy Steel Plug

Inquiry Cart 0