Wear Resistant 6㎥ Volume Drilling HDD Mud Recycling System

Brand Name:Pangolin
Delivery Time:5-15work days
Payment Terms:T/T
Place of Origin:Hebei China
Price:Negotiable
Packaging Details:According to customer needs
Contact Now

Add to Cart

Verified Supplier
Location: Langfang Hebei China
Address: Guangyang Plot, Langfang City, Hebei Province, China
Supplier`s last login times: within 48 hours
Product Details Company Profile
Product Details

Wear Resistant 6㎥ Volume Drilling HDD Mud Recycling System


Machine Shale Shaker For HDD Mud Recycling System Easy To Operate And Safe


Introduction

The HDD drilling fluid recovery system is designed for horizontal directional drilling rigs (HDD).

According to the needs of drilling mud, HDD mud recovery system can include vibrating screen, desilting cyclone, desilting cyclone, decanter centrifuge, mud tank, mud agitator, mud gun, transfer pump, etc. The mesh size of the vibrating screen will be based on the performance of the vibrating screen for mud flow and drilling mud separation, and in different mud requirements.


Main structural features

1. Good capacity and performance: The system capacity can reach 240m3/h (1000GPM), which can meet the slurry treatment of large-scale trenchless projects.
2. All parts of the equipment are connected quickly, easy to disassemble and save time.
3. Explosion-proof lamps meet the requirements of night construction, easy to operate, safe and reliable.

4. The high-abrasion resistant polyurethane cyclone separator is the same as the international brand, and can be used for more than 3800 hours, with long service life and good interchangeability.


Advantages

1. Modular design, small footprint, flexible configuration and installation according to customer requirements.
2. The side plate of the mud box is designed as corrugated bearing heavy duty, safe and reliable, and can bear large load.

3. The system adopts electric centralized control, which is easy to operate.
4. All equipment adopts corrosion-resistant and wear-resistant design with long service life.
5. Suitable for harsh drilling conditions, cold resistance, heat resistance, explosion-proof, leak-proof, corrosion-resistant, and rain-proof.
6. Simple installation and disassembly, convenient for frequent movement of drilling personnel.


Product parameters


CustomizedYES
Capacity50-240 ㎥/h (200-1000 GPM)
Screen Area2.2-8.4 ㎡
Separation Stage2stage / 3stage
Tank Volume6 -30 ㎥
Total Power25-184 Kw
Total Weight5.5-20 t
Land Transport Dimension (mm)customized
Screen materialPolyurethane
Cyclone (mm)250 -900
Impeller materialCr26
ApplicationDrilling
SpecificationCan be customized according to requirements

ModelCSJ-FN-30CCSJ-FN-60CCSJ-FN-120CCSJ-FN-200C
Capacity (m3/h)3060120200
Slurry pumpModelDC-EHM-1.5CDC-EHM-3CDC-EHM-3CDC-EHM-4C
Power (Kw)7.5112237
Pressure (MPa)1.0~2.0
Shale shakerPower(Kw)1.5233
Vibration force(KN)30406060

Screen

size (mm)

UP1400X6001700x7001900X10002100x1200
Down1400X6001700x7001900X10002100x1200
Cone ModelFN-100FN-150
Cone Number36128
Separation size (μm)10-30
Total Power (KW)9132540
System Max.Size(mm)1650X1450X21502000X1600X22502170X2000X24002400*2300*2400
System weight (Kg)1200190025003500

Field of use

HDD mud recovery system working procedures

1. There is a drilling rig on each side of the drilling rig, and a set of vertical mud pumps are installed on the top of the drilling rig to feed the vibrating screen. The shale shaker separates the drilling cuttings, and the fluid part falls into the sand trap through the screen holes.

2. After 1 or 2 or 3 sets of desander cyclone separators are placed on the shaker, a set of centrifugal pumps will be used in the second stage to separate the desander cyclone. Solid desander will be discharged from the shaker or directly cut the box and liquid flow desander will flow into the desander chamber.
3. After the de-sander, a certain number of de-sand cyclones will be placed to separate fine particles. The solids except the de-sand will be discharged into the vibrating screen or cuttings box, and the fluid in the de-sand will enter the de-sand chamber .
4. The mixing pump is installed on the anti-skid trough to transport the drilling mud and inject the mud into the mud hopper to remix the new mud with new chemicals. The mixing hopper can be installed on the top of the tank or on the slider according to customer requirements.


Pic Show



FAQ:


1. How to order products?

Please send an inquiry with a detailed item description or model number.


2. How about ordinary packaging?

A: If there is no special packaging requirement, we will handle it as normal packaging. Put them in a small carton first, and then put them in a big carton together to ensure that the goods are complete.


3. Can I expect high-quality products?

Yes. Mature production technology ensures that product quality meets international requirements.


4. How to confirm whether the product is what you want?

Answer: If possible, please attach a reference picture to avoid misunderstanding, or attach any link to our website for better understanding.


5. How to control quality?

A: We have our own experienced QC team, each order will be strictly inspected and tested before shipment.


6. Competitive price:

A: Our factory can provide you with the lowest price and sell directly to customers, no distributors are needed!


China Wear Resistant 6㎥ Volume Drilling HDD Mud Recycling System supplier

Wear Resistant 6㎥ Volume Drilling HDD Mud Recycling System

Inquiry Cart 0