AW-010 Spray Polyurea Waterproof Coating
AW-010 spray polyurea waterproof coating is composed of isocyanate prepolymer, polyether amine, amine chain extender and other additives, etc. It is the third generation polyurea elastomer which performance fully conforms to the technical requirements of the national standard GB/T 23446-2009 Spray Polyurea Waterproof Coating. The coating is applied by special high-pressure airless spraying equipment. The coating has the characteristics of fast cure high strength, high elongation and seamless, etc. It is a revolutionary leap of traditional coating technology and one of the most advanced waterproof construction technologies in the world.
Advantages:
AW-010 spray polyurea waterproof coating can be widely used in large building structures, chemical infrastructure, underground tunnels, water conservancy facilities and other waterproof projects. The typical application fields include dams, embankments, reservoirs, canals, and other water conservancy facilities; sewage treatment tank, storage tank, swimming pool, water park; roof, basement, tunnel waterproof; wearproof and waterproof stadium stands.
3. Physical Properties
Tensile Strength/ MPa | 20 |
Elongation at break/% | 500 |
Tear strength/(N/mm) | 61 |
Adhesion/(pull off, MPa) | 3.2 |
Abrasion resistance/(750g/500r),mg | 16 |
Moisture absorption/% | 3.0 |
Impermeability | 0.4MPa,2h Impervious |
Shock resistance/ kg·m | 1.0 |
Low temperature flexibility/ ℃ | -40℃ pass |
4. Product Characteristics
Solid content/% | 99.5 |
Gel time/s | 20 |
Tack free time/s | 90 |
Color | Optional |
A: 220kg/drum
B: 210kg/drum
Packing specification can be changed as per customer request.
1. Substrate treatment
The surface shall not have water, dust, floating rust, oil, and
other pollutants. Generally, it is recommended that sandblasting or
manual (mechanical) grinding be used for fully clean up to make the
surface cleanliness meet the requirements of the corresponding
cleaning standards. For concrete substrate, surface defects such as
cracking and bulge should be repaired first.
2. The construction of spray polyurea waterproof coating
In order to ensure the material performance, the material should be
stirred evenly before construction, so that the whole material
system state is even up and down, must use special high-pressure
two-component 1:1 polyurethane/polyurea spraying equipment (the
heating capacity >75℃, the maximum pressure up to 3500psi), such
as GRACO E-XP2, H-XP3, H-20/35 equipment, and the corresponding
collision spray guns.
1. During construction, the temperature of the substrate should be
higher than the dew point temperature by more than 3℃. Avoid
construction in bad weather such as wind, rain, and snow.
2. Before construction, Component B must be fully stirred evenly.
3. If the coating is used for multiple times, the packaging drum
should be sealed tightly at any time after the material is taken,
so as to avoid the moisture absorption and deterioration of the
material affecting the use and performance.
4. During construction in a closed space, good ventilation should
be ensured, and specific cleaning agent should be used to clean the
spray gun after spraying every time.
5. Coating interval: the shortest time is not limited; the longest
time is not more than 3 hours.
In the process of using AW-010, workers must wear work clothes,
wear goggles, gloves, gas masks and other labor protection
supplies; the construction space must ensure good ventilation, at
the same time, isolate fire source and keep away from heat source.
1. This product should be stored in a cool, ventilated, and dry
warehouse. It is strictly prohibited to be exposed to rain and sun.
Isolate fire source and keep away from heat source. The storage
temperature should be 15~40℃. The shelf life is 12 months from the
date of manufacture without opening the original packaging.
2. This product is organic solvent free and can be transported as
non-dangerous goods. During transportation, it shall be strictly
prohibited to be exposed to rain and sun and shall comply with the
relevant regulations of the transportation department.
1. It is recommended to use special cleaning agent to clean tools
and spray gun accessories.
2. The equipment should be regularly and timely maintained in
strict accordance with the instructions and suggestions of the
equipment manufacturer.
1. The performance of the material is largely affected by factors
such as spraying thickness, uniformity, and substrate surface
preparation. The agreed using conditions should be met when using
this product.
2. This specification is an accumulation of long term testing and
experience. Published technical data and instructions are subject
to change without notice.