

Add to Cart
4-35 Small Brick Making Machine Capable Of Making Bricks Of Various
Sizes
1. Product introduction of 4-35 Small brick machine
4-35 Brick making machine is a small brick making machine
equipment, its unique structure, the use of control system. In
addition to the frame itself, the suspension and connection parts
of the whole machine are using springs. Vibration molding not only
to achieve the indenter, mold box, mold core and support plate
vibration under the four tubes, to ensure the product of high
compactness and uniformity, and stable operation, low noise, to
achieve good vibration reduction effect. All kinds of size brick
type can be done, can replace the mold.
Brick making machine raw materials: slag, sand, gravel, aluminum
red slag, electrolytic copper slag, coal gangue, construction
waste, fly ash, cinder and other raw materials. Rich raw materials,
can be seen everywhere, investment plant, extremely convenient.
Production process of brick making machine: Raw materials (40%
stone powder, 40% sand, 10% cement, 10%-15% moisture) are evenly
mixed by the mixer, transported to the hopper of the main engine by
conveyor belt, dropped to the mold of the main engine by the
blanking wrench switch, and then formed by the control cabinet.
After forming, the finished products are transported to the drying
site by the supporting fork brick car.
2. Table of theoretical capacity of 4-35 Small brick machine
Model | Name | Block specification | Plate/piece | piece/h |
4-35 | Block brick | 390*190*190 | 4 | 360 pieces |
Standard brick | 240*115*53 | 21 | 1800 pieces |
3. Configuration list of 4-35 Small brick machine
Name | Model | QTY | Power (kw) |
Main machine | 4-35 | 1 set | 4.8KW |
Conveyor | 6000*500 | 1 piece | 3KW |
Blender | Jq-400 | 1 piece | 5.5KW |
4. Dimensions of 4-35 small brick making machine
No. | Name | Dimensions(m) |
1 | Main machine | 1.37*1.46*1.9 |
2 | Conveyor | 3.3*0.8*0.7 |
3 | Blender | 1.22*1.22*1.27 |
Weight | 1.2T |
FQA
Q: Why we believe in luoyang zhongtai industries co., ltd:
A: 1. More than 30 years experience.
2.We are the leading professional supplier of mining machinery,
construction machinery, machines casting and forged parts.
3. All products achieved ISO9901:2000 quality management
certificate and CE, ROHS certificates.
Q:Delivery time :
A: Parts lead time 1-2months, machines 2-3months.
Q:Payment terms :
A: Accept payment type: T/T, L/C, Western union,Cash. 30% deposit
when signed contract. Full payment paid before shipping.
Q: Quality warranty?
A: Guarantee time: one year for main machinery. If something wrong
we will provide the technical advice and find solution immediately.
For those wearing parts we guarantee high quality parts for
long-term supply.
Q: After sales service?
A: We can supply technical guide for machines running test and
parts maintenance if end user needs.