Prefabricated Labour Quarters Prefab Steel House

Brand Name:KHOME
Certification:CE, ISO, SGS, PVOC
Model Number:KHPSH
Minimum Order Quantity:300 square meters
Delivery Time:30 days
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Active Member
Location: Xinxiang Henan China
Address: 843 Room, Guomao Mansion, No.356 Xin'er Street, Hongqi District Xinxiang, China.
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

Prefabricated Labour Quarters Prefab Steel House


Modular Prefabricated Houses can save a lot of time and labor costs during the construction process.

This is favored by many customers. Because light steel structure houses are light and strong,

they are very suitable for building low-rise buildings. building.


Houses with light steel frame can be used to build factories, warehouses and other buildings.

Houses using light steel as building materials have a history of many years,

so there are no technical problems in structural maintenance and decoration.

Compared with timber buildings, light steel structure houses can reduce the felling of trees,

and these steel materials can also be recycled and reused during the post-processing of the house,

thus greatly reducing environmental pressure.


We are a light steel structure house production company located in Xinxiang City, Henan Province, China.

We can customize a variety of functional light steel frame houses for you.

You only need to leave a message on the website or find us by email, our customer service Will reply to you as soon as possible,

you can consult if you have any questions.


Usually, Prefab Steel House can also be very beautiful, with good thermal performance, earthquake resistance,

and sound insulation effects.
In the manufacturing process of these houses, the corresponding water and electricity will be designed in

the early stage to meet the different needs of customers for the functions of the houses.

We will feedback to you on every link of sales and look forward to your consultation.



Prefabricated Workforce Lodging Technical Specifications:


Steel Column2C80*40*1.5 painting
HerringbonePre-welded C80*40*1.3/U50*35*1.3 electro-Galv.
First floor main beamC80*40*1.5/U50*35*1.2 electro-Galv.
First floor secondary beamC80*40*1.3 electro-Galv.
Roof purlinL40*3 electro-Galv.
Ground channel steelC80*40*1.3 electro-Galv.
Steel staircaseSquare tube 30*30*2.0/40*40*2.0, 2.5mm checkered plate painting
Steel Corridor1.8mm galv. steel plate/L40*3/tube 40*20*1.0 painting
Roof panel50mm/75mm/100mm Fiberglass/Rockwool/EPS sandwich panel
Wall panel50mm/75mm/100mm Fiberglass/Rockwool/EPS sandwich panel
*Suspended ceiling (*Optional)7.5mm gypsum board with frame
First floor board18mm plywood board
*Floor leather (*Optional)1.5mm PVC floor leather
*Electrical system (*Optional)Cable/Lights/Switch/Socket/PDB
*Sanitary facilities&plumbing (*Optional)Ceramic toilet/washbasin/shower, input & output pipes

Prefab Homes Steel Frame:

Prefab Steel Home Foundation & Flooring:

Prefab Steel Home Ceiling System:

Prefab Steel Home Roof panel & Wall Panel:

Prefab Steel Home Door and Window Units:

Other Optional Facilities:
Electrical Fittings:
Electrical wire;
Socket;
Light;
Electrical distribution box;

Sanitary Ware & Plumbing:
Close tool;
Urinal;
Wash basin;
Shower head, Shower base;
Water drainage pipe.

China Prefabricated Labour Quarters Prefab Steel House supplier

Prefabricated Labour Quarters Prefab Steel House

Inquiry Cart 0