

Add to Cart
Fast Projects Prefabricated Container Modular Hospital Buildings
Modular Buildings in CORONA VIRUS (Covid-19) Period;
K-home modular healthcare and hospital buildings offer
high-performance in accommodation to the healthcare industry.
Field and Pandemic Hospital - Fast and Modular Installation
Prefabricated Hospital Buildings are suitable for fast projects. Modular Hospitals, Clinics and
Medical Office Buildings are prefabricated for being fast in
manufacturing and installing. Modular construction in hospitals and
other healthcare buildings provides the most efficient solution for
patient accommodation.
Quickly-assembled educational and medical buildings
Prefabricated modular hospitals are produced with high building safety, taking into consideration
the intensive use, in addition to ergonomic area design and hygiene
structures. Our modular buildings give an important alternative to
conventional structures thanks to their advantages of demountable
high-tech quick production system, short time assembling, and
economic prices.
Our healthcare buildings are produced according to international standards and can have sections such as management offices, laboratories, doctor and patient rooms, polyclinics, operation rooms, wc and shower units.
Size: | 6000(L) X 3000(W) X 2800(H) |
Color: | White, Blue, Red or Customized Green |
Wall & Roof: | 50mm EPS sandwich wall panel or customized |
Window & Door: | PVC sliding window and steel door or customized |
Flooring: | MGO board and PVC carpet or customized |
Layout: | Customized |
Install time: | 2 units by 3 workers in 1 day without crane or forklift |
Earthquake resistance: | Grade 8 |
FAQ
1. You are manufacture factory or trading company?
We are manufacture factory. And you are welcomed to visit us at any
time. The quality control flow and sales team will show you our
professionalism. you will can get best and most competitive price
after visiting us.
2. Is your price competitive compared with other companies?
Our business objectives are to give the best price with same
quality and best quality with the same price. We will do everything
we can to reduce your cost and guarantee you get the best product
that you paid for.
3. Can you send engineers or whole team to install my project?
We will give detailed installation drawings and video for free. We
can send engineers as installation director or a team upon request.
4. Do you offer designing service for us?
Yes, we could design full solution drawings as your requirements.
5. What is the delivery time?
Delivery time depends on order quantities. In general the delivery
time to nearest seaport in China will be 30 days after receiving
deposit.
6.How can I get the quotation of the project ?
If you have drawing, we can offer quotation accordingly.
If you don't have design, we will design some drawings for your
confirmation, and then offer quotation.