

Add to Cart
4t No Pollution High Efficiency Fully Automatic Electric Heating Steam Boiler
Electric heating steam boiler in use, must follow the correct instructions to operate, in fact, every operation process is
very important, because we use, every step as long as a slight poor pool, will be the later product quality and efficiency
caused a certain harm, so say, can not be sloppy, then we will
understand its basic instructions.
1, before the opening of the equipment to confirm that the valve
position is correct, water supply, power supply is normal.
2, press the power switch, power indicator son, controller alarm
(due to water shortage in the boiler) at the same time the water
pump began to run, rehydration to ultra-low water level after the
controller stop alarm, boiler operation indicator light, automatic
water to high water level, water
pump stop.
3, rehydration to the middle water level, furnace pressure is low,
the electric tube automatically began to heat.
4, electric heating steam boiler pressure to reach the set value,
automatically stop heating, at this time can open the valve, the
use of steam.
5, when using steam, the pressure in the furnace drops, down to the
lower pressure setting, automatically start heating.
6, the use of steam, the water level in the furnace continues to
decline, when the low water level, that is, to start the pump, to
the furnace water to the high water level.
7, when the water level is lower than the low water level, the
rehydration system is not working properly, after 10 seconds the
water level did not reach the low water level electrode,the
electric tube stopped heating, such as the water level continues to
drop below the ultra-low water level electrode,the controller alarm
and stop the furnace protection.Shutdown 1, electric heating steam
boiler work finished, press the "power supply" switch to turn off
the power supply, power light out, turn off the power supply
switch.2, waiting for the pressure gauge down to 0.15 to 0.1MPa,
the
sewage valve openforthed, close the water valve.When we operate the electric heating steam boiler, before starting, we must do a good job of inspection, to see if there is an installation problem, or whether the operation is normal, etc. , there must always be a basic commissioning work, and then, after the shutdown, also need a certain amount of maintenance, so, and then familiar with the operation instructions, we have to understand the entire operation process.
WDR4-0.7
NO; | Name | Unit | Number | Description |
1 | Rated output | t/h | 4 | |
2 | Rated working power | Mpa | 0.7 | |
3 | Rated steam pressure | ℃ | 170 | |
4 | Heating efficiency | % | 99 | |
5 | Output diameter | mm | DN50 | |
6 | Design fuels | / | Electric | |
7 | Safety valve diameter | mm | DN40 | |
8 | Bulk size | mm | 4420×2360×2230 |
Pre-sale service:
We help customer choose the best boiler model according to
different requirements of various industry. Before delivery we
will provide foundation drawing, layout drawing, boiler room
layout, etc.
In-sale service:
We keep 24 hours online and keep close contacts during the
production process to ensure on time delivery with perfect
finished product.
After-sale service:
1. provide full range of original spare parts.
2. Engineers abroad installation and commissioning service is
available.
3. Our engineers will held a training for boiler workers to
ensure the safe operation.
4. Free maintenance and repair for one year and lifelong
service.
Boiler application areas