EN 13157 Construction Works 9T G80 Manual Chain Hoist

Brand Name:Silence
Certification:ISO CE
Model Number:HSH
Minimum Order Quantity:20 sets
Delivery Time:7 days
Payment Terms:T/T, L/C
Contact Now

Add to Cart

Verified Supplier
Address: Crane Industrial Park, Changyuan County, Henan Province, China.
Supplier`s last login times: within 17 hours
Product Details Company Profile
Product Details

Heavy Duty 0.25-9T Lever/ Chain Hoist Block For Manural Lifting Cargoes Best Price


Product description:


1. Adopting the deep groove ball bearing of load chain sprocket , pulling is smaller.


Equipped with needle bearing for supporting driving shaft it to increase the mechanical advantage.


2. Adopting double pawl brake system and double chain guide roller system, operation is more safe and stable.


3. The top and bottom hook are made of forged high strength alloy, accomplished by heat treatment process.


The hooks also have three stretch indicators.




Features:

1) SAFE,RELIABLE IN OPERATION WITH MINIMUM MAINTENANCE.


2) HIGH EFFICIENCY AND SMALL HANDPULL.


3) LIGHT WEIGHT AND EASY HANDLING.


4) SAFETY FACTOR:4 TO 1


5) FATIGUE TESTED AT 1.5TIMES OF WORKING LOAD LIMIT TO 2000 CYCLES.


6)STANDARD: EN 13157.


Product Parameter


Model CodeLEV0250LSLEV05001LSLEV0800LSLEV1600LSLEV3200LSLEV6300LSLEV9000LS
Capacity T0.250.50.81.63.26.39
Standard Lift m11.51.51.51.51.51.5
Running Test Load T0.3750.751.22.44.89.4513.5
Effort To Lift Rated Load N282256250373395398400
Falls of Load Chain1111123
Load Chain Diamater mm4x125x156x187x2110x3010x3010x30
A mm92105157178206206206
B mm717894104118118118
C mm8580140145199230342
O mm3131.537.542.5506585
E mm25252631374655
Min. Distance between hooks H245330365400520595800
Length of Lever Handle D160300245325405405405
Net Weight Kg1.847.910.914.43550
Extra Weight Per Meter of Extra Lift Kg0.410.520.81.12.24.46.6



Maintenance method:


1. After use, the gourd shall be cleaned and coated with anti-rust grease and stored in a dry place.


2. The maintenance and overhaul should be carried out by those familiar with the hoist mechanism to prevent those who do not understand the


performance principle of the machine from dismantling at will.


3. Gear installation shall be operated according to the drawing.


4. When installing the groove nut, turn the hand wheel clockwise first, so that the ratchet wheel and friction plate are pressed on the brake air seat


and then the groove nut is installed.


5. After cleaning, inspection and overhaul of the hoist, no-load and heavy-load tests should be carried out to confirm that the hoist is working


normally, automatic and reliable before crosslinking.The friction surface of the brake must be kept clean







Workshop scene


Shipping and packaging



China EN 13157 Construction Works 9T G80 Manual Chain Hoist supplier

EN 13157 Construction Works 9T G80 Manual Chain Hoist

Inquiry Cart 0