

Add to Cart
Highway Beam Guardrail Roll Forming Machine W Beam Crash Barrier
Highway Beam Guardrail Roll Forming Machine W Beam Crash Barrier
Processes: Hydraulic de-coiler-Leveling device--Punching station--Roll forming machine-PLC system-Hydraulic system-Cutter-Output table
highway road guardrail W shape bumpls road barrier making machine cold roll forming.Highway Guardrail plate is mainly used in national high-speed railway, highway road reconstruction projects and industrial hardware products and other industries. When subjected to external forces, the deformation of guardrail plate and column can absorb impact force to protect pedestrians and vehicles.Is a common road safety emergency protection facilities.
Specification
Highway Beam Guardrail Roll Forming Machine W Beam Crash Barrier | ||
1 | Raw material request | cold rolled or hot rolled steel,galvanized steel,SS316L/Mild Steel |
2 | Effective width | 310mm |
3 | Roller station | 17 rows forming 7 roller leveling |
4 | Thickness of feeding material | 2.0-2.5 mm |
5 | Productivity | 8-12m/min |
6 | Rollers' material | 45# forging steel |
7 | Diameter of shaft | 100mm |
8 | Cutting tool material: | GCr12 with quenched treatment 60-62°C |
9 | Weight | About 6.9T |
10 | Size | 13.5*1.85*1.6mm |
11 | Voltage | 380V 50Hz 3phases |
12 | Wall thickness of main forming machine | 14mm steel plate |
13 | Main forming machine body | 300 mm H steel |
14 | Total power | 22+11 kw |
15 | Leveling power | 2.2 kw |
Guarantee
1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 60 working days after the down payment is received.