

Add to Cart
Self Lock Standing Seam Roll Forming Machine Portable Snap Clip Lock
Self Lock Standing Seam Roll Forming Machine Portable Snap Clip Lock is widely used, because it’s impossible for the water to get under the connected roofing panels, thanks to lock’s special shape.
After installation on the roof the panels are closed using special double standing seam closing tools (manual tool for closing seam lock or electric seaming machine for closing double standing seams).
standing seam machine can be easily adjusted for various width of metal roofing panels.
Operator can change the width of the panels with just a single turning handle at one side of the machine. This is a proven technical convenience that allows operator to use his working time more effectively.
1.Processing material | aluzinc/galvanized steel/colored steel coil |
2.Material thickness | 0.3-0.8mm |
3.Feeding width: | As drawing |
4.Effective width | As drawing |
5.Main motor power | 4kw |
6.hydraulic pump power | 4kw |
7. Shaft diameter | 65mm |
8.Forming steps | 13steps |
9.Main frame | 300H Steel frame |
10. Side plate thickness | 16mm |
11.Roller material | 45# forged steel, with hard chrome plating |
12.Control systerm | Delta PLC control system with touch screen |
13.Cutting blade material | Cr12. |
14.Working speed | About 10-15m/min |
15. Transmission way | 1 inch chain drive |
16. Machine size (mm) | About 5800*1000*1400mm |
17. Machine weight | About 1.5ton |
18.Power supply | 220v,3phase,50hz or accodring to customer request |
Guarantee
1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 30 days after the down payment is received.