Add to Cart
3m to 6m Metal cold sheet Plate Hydraulic Bending Machine Metal
Sheet Bending Machine Side wall Flashing Making Machine
1. First, connect the power supply, open the key switch on the
control panel, and then press the oil pump to start, so that you
can hear the sound of the oil pump. (The machine does not act at
this time)
2, travel adjustment, the use of the bending machine must pay
attention to adjust the travel, must be tested before bending.
Bending machine die down to the bottom must ensure that there is a
plate thickness clearance. Otherwise, it will cause damage to the
mold and machine. The adjustment of the stroke is also electric
quick adjustment and manual stomach adjustment.
3, bending groove selection, generally choose the plate thickness
of 8 times the width of the notch. Such as bending 4mm sheet
material, need to choose about 32 notch. 4, the rear stopper
adjustment is generally electric rapid adjustment and manual fine
tuning, the method is the same as the plate shearing machine. 5,
step down the foot switch to start bending, bending machine and
shearing machine is different, can be released at any time, loosen
the foot bending machine will stop, continue to step down.
Equipment Detailed Parameters:
No. | Main parameter | |
1 | Suitable to process | color steel plate, steel plate, galvanized sheet and so an. |
2 | Max. Plate Thickness (mm) | 0.3 ~ 2mm |
3 | Bending Angle | 30° 45° 60° 90° 130° |
4 | Motor power | 3KW |
5 | Weight | 3800 KG |
6 | Material | prepaitned steel |
7 | Warranty of core components | 1 Year |
8 | Voltage | 380V 50Hz 3phasesas per requested |
9 | Core Components | Motor, PLC |
10 | bending type | hydraulic |
Guarantee
1. Guaranteed against malfunctions due to manufacturing defects for 12 months after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% TT in advance
60% TT before the shipment and after inspection
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 20 days after the down payment is received.