C Purlin Steel Frame C Channel Roll Forming Machine / Making Machinery

Brand Name:FMS
Certification:CE
Minimum Order Quantity:1set
Delivery Time:45 worl days
Payment Terms:T/T, L/C
Place of Origin:china
Contact Now

Add to Cart

Verified Supplier
Location: Cangzhou Hebei China
Address: ROOM 703, Yihe Building, Cangzhou City, Hebei province,China
Supplier`s last login times: within 15 hours
Product Details Company Profile
Product Details

C Purlin Steel Frame Making Machinery C Channel Roll Forming Machine


The C Purlin Steel Frame Making Machinery C Channel Roll Forming Machine is composed of hydraulic shear head, roll forming system, electrical system, etc.
The
Manual galvanized steel C U purlin roll forming machine / C channel purlin machine has the following characteristics:

1. Advanced technology: the line adopts continuous coil production after cold bending to determine the precision of the long cutting parts forming shape rules length accurate consistency.Good appearance and high strength of molding workpiece.

2. High productivity: this line only needs 2-3 people to operate, with simple operation and low labor intensity. The production
speed of this line is adjustable from 10 to 15 meters per minute, and the normal operation speed is 8 to 15 meters per minute.
3. High reliability: the main components of the hydraulic, pneumatic and electrical systems of this line all adopt imported
high-quality components with stable performance and high reliability materials applicable to high technical parameters.

specifications


Raw material
Steel Coil gi ppgi
Control systemPLC(imported Brand)
Thickness1-2mm
Roller Station18 Stations
Weight2500 kg
Power4KW
Production Capacity15-20m/min
Warranty of core components1.5 years

Guarantee

1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.

2. Repairs will not be performed even during the guarantee period in the follow circumstances

- Damage occurs due to a natural disaster

- Malfunction occurs due to user error

- Malfunction occurs due to modifications

- Malfunction occurs due to further movement or shipment after installation


Payment terms


40% in advance as down payment

60% is paid before the shipment is processed


Delivery


FOB: Tianjin Xingang Port

The Delivery Time: 30 days after the down payment is received.


China C Purlin Steel Frame C Channel Roll Forming Machine / Making Machinery supplier

C Purlin Steel Frame C Channel Roll Forming Machine / Making Machinery

Inquiry Cart 0