

Add to Cart
1. Simulating standard open airway
2. External breast compression: display device and alarm device
(a) indicator light display of correct and wrong compression ;
alarm of wrong compression;
(b) Intensity display of correct (at least 5cm) and wrong (less
than 5cm) compression; alarm of wrong compression.
3. Artificial respiration (inhalation): display device and alarm
device
(a) Inhalation <500-600ml or > 600ml, wrong indicator light
display and alarm prompting; inhalation between 500-600ml right
indicator light display;
(b) Indicator light display open airway;
(c) Inhalation too quickly or too much result in air entering into
stomach; indicator light display and alarm prompting.
4. Ratio of compression and artificial respiration: 30:2 (one or
two person).
5. Operating cycle: one cycle includes five times of 30:2 ratio of
compression and artificial respiration.
6. Operation frequency: at least 100 times per minute
7. Operation methods: exercise operation
8. Examination of pupil response: mydriasis and myosis
9. Examination of carotid response: pinch the pressure ball by hand
and simulate carotid pulse
10. Working conditions: Input power is 220V; Output power 6 V. or 4
D size battery in case of training in the field
Installation process
1 --Sims first upper and lower extremity components removed from
the canvas suitcase in a simulated human buttocks side fixed latch
out of a leg , the two lower limbs insert the correct position and
makes hip hip and thigh holes aligned holes , respectively , will
be after fixing bolt is inserted through the side of both lower
extremities from the hips protrude from the other side of the hip
is fixed , so Sims completed the installation is complete .
The recovery operation mat rolled out, the person lying supine on
the operating analog pad , the analog electronic monitor for people
with the power cord , then 220V, 500MA/6V external regulator
removed from the canvas to connect with electronic displays , then
plug into external power regulator 220V power , to complete the
entire connection process.
2 --the function settings before the operation and use
After completing the connection process, that turn the power switch
on the electronic display , press the start button , depending on
the operating frequency of 100 beats / min, began to operate.
3 --during the operation , we must master the standard action and
Handling .
Packing & Delivery
Packing | |
Size: | 115(L) x 45(W)x30 (D) cm |
Weight: | 13kgs |
Details: | The normal package is Neutral carton . If export to european
countries , the Neutral carton will be designed . It depends your
order . |