Crane Solar Panel Installation Piling Vibro Driver Multipurpose

Brand Name:VIBRA
Model Number:FV-330
Minimum Order Quantity:1 set
Delivery Time:8-35 days
Payment Terms:L/C, T/T, D/P
Place of Origin:SHANGHAI
Contact Now

Add to Cart

Verified Supplier
Location: Shanghai Shanghai China
Address: No.3652, Cao'an Road, Jiading district, Shanghai
Supplier`s last login times: within 45 hours
Product Details Company Profile
Product Details

Description


Our pile drivers can work with a variety of piles, square piles or round piles or other shape of steel piles.To ensure the high working efficiency of the whole machine, we use hydraulic systems with big power and great flow, the pile driving mechanism with multi-speed control and being quick in getting ready for operation.


Why VIBRA?

  • 11 years in this business
  • more than 1000 users
  • Almost 500 sets sell per year
  • Have customers who are using it for than 3 years without having any problem

Application


1) It can applied in any kind earth like Clay, soft soil, sand layer ,etc


2) Noise regulated area


3) Suitable to use in vibration regulated areas, such as near buildings, precision instrument buildings, subway, overpass and so on.



Technical Parameter


ItemFV-250FV-280FV-300FV-330FV-350LFV-350FV-400
Vibration Frequency (rpm)2500280032003200320032003200
Operation Pressure (Mpa)30323232323232
Centrifugal Force (KN)265335350372435455485
Max.Pile Length (m)10121212151518
Arm Weight (kg)500500670670670750750
Hammer Weight (kg)1700190021002300240026002700
Excavator (T)20-3020-3030-3533-4035-4040-4545-60

FAQ


Q: How long is the warranty period ?


A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.


Q: What is the MOQ ?


A: 1 set is available.


Q: What's the payment method ?


A: We accept T/T and D/P payment. L/C will be accepted for order avobe USD 35,000.


Q: What is the delivery time ?


A: The delivery time is generally 7-35 days, and arrive at Shanghai Port. Shipping time should be considered overseas.


Q: Can I have our LOGO on the machine ?


A: Of course you can.


Q: How is your product quality ?


A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".


Q: Can I be your dealer ?


A: Welcome to become our dealer, and we are looking forward to further developing into a regional general agent and strategic partner like you with lofty ideals!


China Crane Solar Panel Installation Piling Vibro Driver Multipurpose supplier

Crane Solar Panel Installation Piling Vibro Driver Multipurpose

Inquiry Cart 0