Socket Reducing Tee Pipe HDPE Fusion Fittings

Brand Name:CR
Certification:ISO,CE,SGS,WRAS
Model Number:50-630
Minimum Order Quantity:50pcs
Delivery Time:5-20 days
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram,Paypal
Contact Now

Add to Cart

Active Member
Location: Chengdu Sichuan China
Address: Room13,15/F Building1, Nine Miles Square No.39 Jiancai Road,Chengdu,China.
Supplier`s last login times: within 24 hours
Product Details Company Profile
Product Details
WRAS / ISO / CE / SGS / Certification HDPE Reducing Tee Pipe Fittings​

Description of HDPE Reducing Tee
The HDPE tee is connected to the HDPE pipe by heat fusion. The working principle is to heat the three pipe ends and press them together to form a permanent joint, which converts each part of the pipe into a continuous line. It is widely used in various applications worldwide, such as water mains, sewer mains, mud transmission lines, rural irrigation, fire protection system supply lines, rainwater and drainage systems.
Parameter Of HDPE Reducing Tee

SpecificationsL
mm
A
mm
B
mm
H
mm
50x40x502308072110
63*25*63168634585
63x32*63172634587
63x40x63180635093
63x50*63190635596
75x32*75180703990
75*40«75205704593
75x50x752057055100
75x63*752257063107
90*32«902157945105
90*40*902207950108
90*50x902307955110
90x63*902457963118
90x75*902527970126
110x32x1102208250115
110x40x1102308250119
110*50*1102388255123
110x63x1102508263118
110x75*1102648270137
110*90x1102758279135
125*63*1253208763143
125*75«1253148770152
125*90*1253098779151
125*110*1253188782160
140*110*1403159282164
140x125*1403309287167
160x50x1602709670161
160x63x1602759863153
160*75x1602879870167
160x90x1603009879175
160x110*1603259882175
160*125x1603359887181
160*140x1603459892186
180*90*18033810579181
180x110*18035510582187
180*125x1803651058791
180«140*18038010592196
180x160x18040010598202
200x63x20030511263176
200x75*20031011270183
200*90*20033011273191
200x110*20035511282196
200x125x20037011287201
200x160x20042011298207
225«90«22534512079207
225x110*22536512082212
225x160x22541712098212
225x1802254339586209
250*90x25039512979218
250*110*25039512982216
250x125x25041012987221
250x160x2503989581218
250x180x250460129105245
250x200x25037975112254
280*90x28041014079235
280x110x28043014082238
280x160x28048014098254
280x200x280520140112268
280x225x280545140122278
280x250x280570140129285
315«90*31542015079255
315x110x31544215082225
315x160*31545013077247
315*180x315503150105291
315*200*31545511095285
315*225x315550150120292
315*250x3154608080248
315*280x315582140110320
355x250355620120120290
355*315x355620120120290
400*200*400670130150380
400x250x400670130150380
400x315x400670130150380
400x355*400670130150380

Difference Between PVC And Hdpe Reducing Tee
In some cases, PVC materials can be glued or stitched under water, while HDPE cannot. On the other hand, HDPE can withstand and weaken shock waves better than PVC. PVC is a heavier and stronger material, while HDPE is harder, more heat-resistant and more wear-resistant
The production method of PE Buttfusin Reducer is one-time injection molding using an injection molding machine. The main raw material is high-density polyethylene (HDPE), and the connection methods are butt joint.Need Buttfusion machine connect it.
Application of Hdpe Reducing Tee
China Socket Reducing Tee Pipe HDPE Fusion Fittings supplier

Socket Reducing Tee Pipe HDPE Fusion Fittings

Inquiry Cart 0