Add to Cart
Industrial design sound plastic shell rapid prototyping sample
Buyers requirements
Documents require
Documents and requirements required to place an order
1. CAD files and 3D model files are required
File format requirements
CAD format: DWG/DXF/PDF
3D model format: STEP/IGS/X-T/PRT and other 3D formats
2: Excel documents of materials, quantity and surface treatment related information required for handboard processing
Just send us the product design document and the production requirement document together!
Inspection process | 1. Material procurement 2. Material testing 3. Material warehousing 4. Receive orders and claim materials 5. CNC machining 6. At the beginning of QC inspection 7. Surface treatment 8. QC total quality control 9. Warehouse of finished products 10.Pack 11. Packing inspection 12. The delivery |
Time limit for a project delivery | 5-8 days (actual duration depends on the quantity and requirements of the product) |
Product packaging | Inner packing: foam, plastic, paper; Packing: thick carton, custom wooden case |
Cooperation process | 1. Provide drawings 2. Engineering quotation 3. Confirm the order 4. Processing 5. Packaging and shipping 6. Confirm receipt of goods |
Transport of goods | negotiation |
About the quotation
Product pricing depends on the precision of processing requirements
The online quotation is not the final quotation, the price is related to the quantity/specification/precision requirements/process requirements.
Please confirm with customer service before placing an order, or make up for the price difference after placing an order.
Company introduction
Shenzhen has 3000 square meters of production workshop, dongguan branch has 2000 square meters of production workshop, the number of employees 200 people, professional technical engineers 56 people. Equipped with a full set of quality testing equipment such as: three-dimensional, curved surface measuring instrument, surface wear tester, chromatism meter.