

Add to Cart
Model | Voltage | HZ | Power(KW) | Power(HP) | Hmax(m) | Qmax(m³/h) | Port Size(inch/mm) |
FLS-370 | 220V-380V | 50/60 | 0.37 | 0.5 | 8 | 11 | 50 1.5” |
FLS-550 | 220V-380V | 50/60 | 0.55 | 0.75 | 12 | 16 | 50 1.5” |
FLS-750 | 220V-380V | 50/60 | 0.75 | 1.0 | 13 | 17 | 50 1.5” |
FLS-1100 | 220V-380V | 50/60 | 1.1 | 1.5 | 15 | 21 | 50 1.5” |
FLS-1500 | 220V-380V | 50/60 | 1.5 | 2 | 16 | 25 | 50 1.5” |
Description
HOW TO USE – It is best to always replace your pump with a pump of
similar size and power rating. Changing over and fitting of the
pump can be done by the handy person but it is recommended to get
it done by a professional. Suitable as a direct replacement OR
upgrade to existing pump.
Our Company:
Freesea is a new type of technology-based enterprise integrating
research, production, agency, sales and service of swimming pool
water treatment equipment, sauna spa equipment, landscape water
treatment equipment, fish pond purification system equipment and
engineering related accessories. The company adopts advanced water
treatment technology to provide optimal configuration and
high-quality complete sets of equipment and related supporting
products for the vast swimming pool, spa bathing center, landscape
fountain pool, sauna pool and fish pond.
Introduction to the installation and operation of the pump
Pump installation points: 1. Install the pump as close as possible
to the pool. The closer it is, the better the pipe is drawn into
the pump. The bending and friction of the pipe will affect the flow
and lift loss of the pump.
2. The suction pipe is standing at the *** end of the pool. It must
be ensured that the suction pipe and the joint are fastened. The
suction pipe should be thicker than the outlet pipe, at least as
thick as the outlet pipe;
3. Avoid installing the pump in a humid, non-ventilated ball. The
motor needs free circulating air to help cool it.
4. Confirm the voltage required by the power supply and the motor.
The phase is consistent with the frequency and the wire used should
meet the motor power and circuit requirements of the power supply.
All power needs to be performed by professionals;
Start and prepare for introduction:
1. Add water to the transition box to make the water surface level
with the water surface of the suction pipe. It is strictly
forbidden to work in the waterless state. The water is here used as
the coolant and lubricant for the mechanical shaft seal;
2. Open all the suction and outlet valves; 3. Turn on the power and
the motor will work normally. Maintenance: 1. Regularly clean the
mess in the transitioner and ensure that the metal screws are
tightened each time;
3. The pump has the function of automatically lubricating the motor
bearing into the shaft seal and requires additional lubrication;
4. Keep the motor clean and ensure that the air supply hole of the
motor cover is clear;
5. Sometimes the shaft seal will be damaged and need to be replaced
on time.
Our Service:
We take customer needs very seriously. Tasks and challenges are
solved together
with the customers - using our high expertise in product
technologies, process
technologies and logistics. Our professionalism guides us through
the development
and production process.
Knowing the customer is the priority of all we do.With the
customers' specific
technical data and requirements fully in mind.We make a promise
that every
process of the cooperation is clear. As production begins, we focus
on working along
multiple lines. Even once the order has closed, MEDAS still
provides meticulous
after-sales service.