Scaffold Drop Forged Grider Board Clamp Scaffolding With Antislip

Brand Name:MF
Certification:ISO
Model Number:Grider Board Clamp
Minimum Order Quantity:500 pcs
Delivery Time:20~30days
Payment Terms:L/C,D/A,D/P,T/T,Western Union,MoneyGram
Contact Now

Add to Cart

Verified Supplier
Location: Zhengzhou Henan China
Address: A Block, Hanghai Square, Erqi District, Zhengzhou City, Henan, China
Supplier`s last login times: within 42 hours
Product Details Company Profile
Product Details

Scaffold Drop Forged Grider Board Clamp with Antislip


The usage for scaffold grider coupler is joins outer diameter 48.3mm steel pipe with steel beam, girder flange thickness can be 44mm at max. Scaffold forged grider coupler must used in pairs each on each side of the beam. Our grider board clamp has antislip screw which make it more solid when using.


Specification of Scaffold Drop Forged Grider Board Clamp with Antislip:


Product nameScaffold Drop Forged Grider Board Clamp with Antislip
ProcessingDrop forged
Girder thickness44mm max
FeatureWith antislip bar at the clamp ring
Bolt size1/2"*92mm, Grade 8.8
SurfaceElectric galvanized or hot dip galvanized
Weight1.5kg/pcs
PackageWoven bad and pallet


1. Pipe joint scaffolding can be one of the most labor-intensive scaffolding systems, but the return on time invested is Unlimited. It is suitable for any architectural situation: high or low, interior or exterior, round or straight, standard or irregular shape.

2. Lightweight scaffolding double coupling with replaceable T-bolts and locknuts, easy and firm to fix on steel pipes.

3. Forged Q235 steel scaffolding double couplings provide higher strength and toughness than pressed or cast iron couplings.

4. The double coupling is galvanized, anti-rust and anti-corrosion, and has a longer service life.

5. Scaffolding double joints are used to connect OD48mm steel pipes at right angles.


1. Q: Can you add my logo on the product's body?
A: Yes, we could produce and add your logo according to your drawing and special demands.


2. Q: What's your MOQ(minimum order quantity)?
A: Any quantity for the sample and stocks..

3. Q: What's your packing methods?
A: Packed into plywood box/ton bag, or in bulk.

4. Q: What's your payment terms?
A: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, or negotiate according to the order status.

5. Q: What's your delivery time?
A: 10-20 days after received the advance payment or L/C.

6. Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.
China Scaffold Drop Forged Grider Board Clamp Scaffolding With Antislip supplier

Scaffold Drop Forged Grider Board Clamp Scaffolding With Antislip

Inquiry Cart 0