The formwork products, systems and design service include bridge formwork, tunnel formwork, and scaffolding.
Boyoun's business is based on a combination of production, equipment sale & rental, installation and maintenance.
The bridge viaduct is divided into small segments, that are prefabricated in the good quality control casting yard, then, delivered to install by good erection equipment.
Key componets
1. Casting Yard and Segment Production
(Geometry Control Program and Software)
2. Segment Erection/ Installation and Equipments
Advantages and Benefits
1. Construction Simplicity
• easier installation of external post-tensioned tendons
2. Time Savings/Cost Effectiveness
• precast segment to be prefabricated and stored at casting yard
while foundation and sub-structure are being built.
• by using efficient erection method and equipment, the rapid
installation of viaduct can be achieved.
3. Quality Control Q - A/QC
• precast segment to be produced in factory-manner condition w/
good quality control.
• minimum interruption natural impacts such as bad weather, rain.
• minimum waste of material
• good precision in production
4. Inspection and Maintenance
• external prestressing tendons can be easily inspected and
repaired if required.
• maintenance program can be scheduled.
Segment casting yard components
1. Short-Line Match Casting and Casting Mould Units
2. Production and Working Space
• Rebar Assembly
• Prestressing Work
• Segment Touch-up/ Repair
• Ready-mixed Concrete Plant
3. Lifting Equipments
4. Storage Area
Professional solution for each project
Prompt offer with competitive price
Process every unique project for client
The Boyoun formwork instructors are specially trained and experienced practitioners who know how to install
Iran Teheran expressway project.
The Teheran expressway project has begun its construction in the
early a few decades ago.
The project total length is 140km, but stopped only for 30km.
Boyoun supplied
Segmental assembly box girder formwork
Tianjin–Baoding intercity railway, also known as Tianjin-Baoding Passenger Line,the railway length is 158 km and with a maximum design speed of 250 km. Most of the new trackage will be on an elevated viaduct, accounting for 65.4% of the line of the being on bridges.
Boyoun supplied
Segmental assembly box girder formwork
Engineering
In Boyoun we invest heavily in R&D in order to add value to the industry. The Boyoun engineering department has created more than 40 patents and utility models.
This has enabled the implementation and industrialization process of "cast in place" concrete structures, in addition to providing added value in security and ergonomics.
Technology
We offer on site consultation and safety advice to help our
customers work safely and improve productivity in each project.
The Boyoun Technical Office combines its staff experience with
advanced CAD systems and self-developed software to do this job.
Boyoun Comprehensive Service
Boyoun strives to be one of the most recognized companies in its
industry due to its comprehensive service capacity.
This output should be yield as a result of the quality of the
company's human team, the range of solutions and services that
Boyoun offers to its clients and its business management focused on
total quality.
Professional solution for each project
Prompt offer with competitive price
Process every unique project for client
The Boyoun formwork instructors are specially trained and experienced practitioners who know how to install
Our factory is located in Binzhou city, Shandong province, where is 350km far from Beijing, 240km far from Tianjin port. Our sales office is located in Beijing city.
You can state your desired Delivery date for your order. The order
and the desired delivery date will be checked after your order got
sent.
When you receive your order confirmation, you will find the
information on your final delivery date (outgoing). We will, of
course, try our best to meet the specified delivery date.
Steel Q235B or Q345B.
The bridge viaduct is divided into small segments, that are prefabricated in the good quality control casting yard, then, delivered to install by good erection equipment.
Advantages and Benefits
1. Construction Simplicity
• easier installation of external post-tensioned tendons
2. Time Savings/Cost Effectiveness
• precast segment to be prefabricated and stored at casting yard
while foundation and sub-structure are being built.
• by using efficient erection method and equipment, the rapid
installation of viaduct can be achieved.
3. Quality Control Q - A/QC
• precast segment to be produced in factory-manner condition w/
good quality control.
• minimum interruption natural impacts such as bad weather, rain.
• minimum waste of material
• good precision in production
4. Inspection and Maintenance
• external prestressing tendons can be easily inspected and
repaired if required.
• maintenance program can be scheduled.
Key componets
1. Casting Yard and Segment Production
(Geometry Control Program and Software)
2. Segment Erection/ Installation and Equipments
Segment casting yard components
1. Short-Line Match Casting and Casting Mould Units
2. Production and Working Space
• Rebar Assembly
• Prestressing Work
• Segment Touch-up/ Repair
• Ready-mixed Concrete Plant
3. Lifting Equipments
4. Storage Area
Professional solution for each project
Prompt offer with competitive price
Process every unique project for client
The Boyoun formwork instructors are specially trained and experienced practitioners who know how to install
Our factory is located in Binzhou city, Shandong province, where is 350km far from Beijing, 240km far from Tianjin port. Our sales office is located in Beijing city.
You can state your desired Delivery date for your order. The order
and the desired delivery date will be checked after your order got
sent.
When you receive your order confirmation, you will find the
information on your final delivery date (outgoing). We will, of
course, try our best to meet the specified delivery date.
Steel Q235B or Q345B.