

Add to Cart
Easy Installation Metal Smelting Furnace With Good Startup
Performance
The special electric furnace for smelting iron, aluminum, copper,
zinc and other non-ferrous metals produced by our company greatly
saves electricity and improves the working environment. The
technology is mature and easy to operate. Service list: According
to the production location, we will make production line drawings
and equipment installation drawings for free.
Provide basic installation drawings of the equipment and other
parts must be made by the buyer. Provide technical parameters of
the auxiliary equipment. Throughout the operation, if the buyer
needs to adjust the layout and use, we can provide free technical
services. Throughout the operation, when we make a technical
update, if the customer wants to upgrade the equipment, we only
charge the cost price.
Main advantage
The melting speed is fast, the solution temperature is uniform, the
oxidation combustion is less, and the composition is uniform.
Small size, small footprint, 24 hours of continuous smelting.
The smelting directly melts, and the solution can be completely
emptied, and the replacement of the product is convenient.
The operation is simple, the environment is good, the transfer is
convenient, and it can be started 100%.
The lining has a long service life and the product has high
reliability.
It has electromagnetic stirring effect, which is advantageous for
uniform composition and slag.
Easy to use and maintain.
Equipment selection
First of all, it is necessary to clearly understand the purpose of
purchasing an intermediate frequency furnace, such as: hot forging
or smelting liquid, or surface heat treatment, etc. This is a
process problem of the operation, and secondly, it is necessary to
consider the working efficiency of the equipment, for example, how
much work is required in one hour? At this time, factors such as
production tempo should be considered.
Main technical parameters
parameter |
|
|
|
|
|
|
| three-phase four-wire 380V 50-60HZ |
|
|
|
|
|
| three-phase four-wire 380V 50-60HZ |
|
|
|
|
|
| three-phase four-wire 380V 50-60HZ |
|
|
|
|
|
| three-phase four-wire 380V 50-60HZ |
|
|
|
|
|
WJZ-1000 | three-phase four-wire 380V 50-60HZ |
|
|
|
|
|
Technical documents provided by the supplier
1. Equipment installation and maintenance instructions;
2. Equipment inspection certificate;
3. Warranty card;
4, the factory packing list.
5. The package is made of custom-made fumigation-free compression
plate.
Operational precautions:
1. Ensure that the installation work has been completed;
2. Please read the contents of the ordinary panel and automatic
control panel function section in this manual to understand the
functions and functions of each operating device on the panel;
3, the input voltage range is 320-420V, when the grid voltage is
higher than 420V, please do not use the equipment;
4. After the device is powered on, it is forbidden to touch the
input connector, output connector, capacitor box connector, sensor,
etc. on the device to prevent the risk of electric shock;
5. Change any wiring inside and outside the equipment, it must be
done after turning off the power of the equipment;
6. The equipment, induction coil and capacitor box must be cooled
by water, and the water source should be cleaned to avoid blocking
the cooling pipeline and causing overheating damage.
Basic steps:
1. Close the external power switch, the air switch on the rear
panel of the device, and the control power switch on the front
panel of the device;
2. Turn on the cooling water and observe that the water pipe has a
certain flow of water;
3. Refer to the “Panel Features” section to adjust the parameters
on the IF power panel;
4. Place the workpiece to be heated into the induction coil;
5. Press the start button on the operation panel, or press the foot
switch to start heating;
6. Press the stop button on the operation panel or release the foot
switch to stop the heating;
7. When shutting down, first turn off the power switch on the front
panel, turn off the external main power switch, and then turn off
the water after half an hour; the air switch on the rear panel of
the device is mainly designed for current limiting protection, in
order to extend its use. Life, always close this air switch, do not
turn off when shutting down. When installing the device, configure
a dedicated power switch and current limit insurance for each
device outside the device.
Pledge
1. The seller installs and debugs the site and trains the buyer.
2. Implement (1+1) technical after-sales service for users, that
is, one equipment has a full-time engineer to carry out perennial
technology tracking service after leaving the factory.
3. In the event of a malfunction, the seller guarantees that it
will be processed within 24 hours after receiving the buyer's
notice.
4. The warranty period is 12 months. During the warranty period,
non-human equipment quality problems cause damage to equipment and
components, and the seller performs maintenance free of charge.
5, in addition to the warranty period, provide lifelong paid repair
and maintenance services.