

Add to Cart
Air Ventilation Deep Drawing Parts Weather Resistant Blades Bird
Mesh
Product Description
The material used to manufacture our stainless steel louvres is
stainless steel 304, with a brushed
texture surface finish. Its construction specifications are the
following: hood, weather resistant blades,
insect screen &fixed mounting connector with clips, all made
out of stainless steel 304. Our stainless
steel louvres can also come equipped with the following
accessories: rubber gasket + drip nose +
mounting screws.
Item code | D (mm) | D1 (mm) | D2 (mm) | H (mm) |
SSL-A 100 | 95 | 100 | 148 | 48 |
SSL-A 125 | 120 | 125 | 188 | 48 |
SSL-A 150 | 145 | 150 | 210 | 56 |
SSL-A 160 | 155 | 160 | 210 | 61 |
SSL-A 180 | 175 | 180 | 272 | 66 |
SSL-A 200 | 195 | 200 | 272 | 70 |
SSL-B 100 | 95 | 100 | 148 | 48 |
SSL-B 125 | 120 | 125 | 188 | 48 |
SSL-B 150 | 145 | 150 | 210 | 56 |
SSL-B 160 | 155 | 160 | 210 | 61 |
SSL-B 180 | 175 | 180 | 272 | 66 |
SSL-B 200 | 195 | 200 | 272 | 70 |
Product detail drawing
Product Specification
Stainless steel louver can be installed in ducts or round openings
in the external walls. It can serve
as an air supply or exhaust vents in the ventilation systems.
Stainless steel louvers have wire mesh
on the inside to prevent the entry of insects or birds (depends on
the size of mesh hole). Our SSL-A
model has an insect screen mesh and our SSL-B has a bird screen
mesh. It has rubber gaskets and
it is fitted with mounting clamps to make its installation easier.
It is featured by an attractive appearance
and a long durability.
FAQ
Q: What is the payment method?
A: We accept TT (Bank Transfer), L/C.
1. For total amount under US$3000, 100% in advance.
2. For total amount above US$3000, 30% in advance, the rest against
the copy document.
Q: What is your MOQ?
A: MOQ depends on our client's needs, besides,we welcome trial
order before mass-production.
Q: What is the production cycle?
A: It varies a lot depending on product dimension,technical
requirements and quantity. We always try to
meet customers' requirement by adjusting our workshop schedule. Usually our normal lead time is 25-30
days for 1 full container; it is also up to the actual production
situation and products structure.
Q: If you make poor quality goods,will you refund our fund?
A: We make products according to drawings or samples strictly until
them reach your 100% satisfaction.
And actually we won't take a chance to do poor quality products.We
are proud of keeping the spirit of
good quality.
Q: Could you offer competitive tooling cost?
A: We have own mold work-shop in our factory, for competitive
tooling cost and on-time
samples.