Customized Stamping Sheet Metal Q345B Steel Elevator Brackets

Brand Name:JH
Certification:SGS, ISO 9001,Ce
Model Number:Brackets
Minimum Order Quantity:negotiable
Delivery Time:30-35 days
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Active Member
Address: Room 1102, Wanda commercial office, No.855 Siming road, Yuyao, Zhejiang, China
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

Customized Stamping Sheet Metal Q345B Steel Elevator Brackets


Information of Product


Product nameElevator Brackets
MaterialQ345B
SizeCustomized
MOQNegotiable
Surface treatmentZinc Plating
Thickness5mm/Customized
SampleOffer
DeliveryCarton Case + Pallet
Advantages1. We are direct factory, best price will offer.
2. Had 20 years experience for manufacturing, exporting, and quality guaranteed.
3. Factory visit welcome.
4. With independent open mold capacity, all sorts of stamping parts can be manufactured according to customer's requirement, drawing, design or samples (OEM).

Product Images



Company profile and Process extension


1997 Established Yuyao Jingqiao Hardware Factory (500m2) for producing metal hardware products;


2004 Started HVAC accessories business, expanded factory size to 2500m2;


2008 Further expanded production range and factory size to 8000m2;


2008 Launched the whole range of Iris Damper (from dia.80mm to 800mm), to be the first (only) Chinese

manufacturer of Iris Damper;


2014 Established Ningbo Aier Ventilation Equipment Co., Ltd (under the same group and management

of JH);


2014 Built a new factory equipped with automatic production lines (size: 12,000m2);


2018 Built another 10,000m2 factory, total production facility size up to 22,000m2.


FAQ


Q: What is the payment method?
A: We accept TT (Bank Transfer), L/C.
1. For total amount under US$3000, 100% in advance.
2. For total amount above US$3000, 30% in advance, the rest against the copy document.

Q: What is your MOQ?
A: MOQ depends on our client's needs, besides,we welcome trial order before mass-production.

Q: What is the production cycle?
A: It varies a lot depending on product dimension,technical requirements and quantity. We always try to
meet customers' requirement by adjusting our workshop schedule.
Usually our normal lead time is 25-30
days for 1 full container; it is also up to the actual production situation and products structure.

Q: If you make poor quality goods,will you refund our fund?
A: We make products according to drawings or samples strictly until them reach your 100% satisfaction.
And actually we won't take a chance to do poor quality products.We are proud of keeping the spirit of
good quality.


Q: Could you offer competitive tooling cost?
A: We have own mold work-shop in our factory, for competitive tooling cost and on-time
samples.


China Customized Stamping Sheet Metal Q345B Steel  Elevator Brackets supplier

Customized Stamping Sheet Metal Q345B Steel Elevator Brackets

Inquiry Cart 0