

Add to Cart
Stable Performance Bath cap making machine
Description:
Automatic integrated production line, a machine can be a finished
product; ultrasonic welding; two straps attached to the cap on both
sides of the body, use can be easily opened; raw materials, high
utilization rate.
1. Automatic tension control;
2. PLC program computer control;
3. Optoelectronic detection device, more accurate position
calculates.
4. Machine frame can be iron and aluminium.
5. Machine can make 3 different size cap without change any spare parts. Customer has to give size while place order.
Production application :
This machine is widely used in :
Working procedure
Film unwinding--feeding---elastic seal----shaping----cutting.
Our Main Machinery Area:
1. Face Mask Making Machine ( Outer/ Inside ear loop face mask
welding machine, Face mask blank making machine, Face mask tie on
machine , Fully automatic mask making machine).
2. PE / Non Woven shoe cover making machine
3. Non Woven Surgical Cap / Doctor Cap Making Machine, PE / Non
Woven bouffant Cap Making Machine;
4. PE glove making machine
5. Plastic bag making machine
6. Tub cover making machine
Parameter
Production size | customized |
Power | 5KW |
Speed | 120-200pcs/min |
Machine size | 366*900*1400MM |
Voltage | 220V |
Machine model | GD-380 |
Company profile:
Wenzhou goodplus machinery is a factory for making automatic
mechines.
Our mainly products including:
A. Non woven disposable face mask making machine
B. Surgical cap/doctor cap/bouffant cap making machine
C. Non woven shoe cover making machine
D. Plastice shoe cover making machine
E. Packing machine,Labeling machine
F. Disposable plastic products making machine.
These products are using in Hospital,Hotel,Dust free room ect. We
have been in this industry more than 20 yeas,we have advanced
technology,professinal team and rich experience.
If you have a spare time,we would be very happy to invite you to
visit our factory.
Wenzhou goodplus are absolutely your trustworthy partners. Any questions you need are welcome to consult us.
TERMS & CONDITIONS:
- One Month
2. Delivery time:
FAQ
Question | Answer |
1. How long will your engineer reach our factory? | Within one week after machine arrival your factory. |
2. How many days will you finish installing? | We will finish installation and training within 15days. |
3. What should we charge for your engineer? | You should charge for the cost of our engineer's visa, air tickets, hotel, food, and also their salary 100USD one day per person. |
4. How long is your machine's warranty period? | All our machine have one year guarantee, starting from finished installation. |
5. How could we do after one year warranty period? | We also can do service for you, but you need pay salary for my technician 100USD/day. |
6. How could we do if the parts broken within warranty? | We would express the free replacement parts during the warranty date. |