

Add to Cart
Bouffant cap making machine
A Process Description :
Elastic, non-woven farbic feeding——Edge Folding——shaping——Welding——cutting
B Technical Parameter :
C Operating Program
1.Adjust the non-woven farbic plate and tension equipment.
2.Pull the non-woven farbics into folding and welding manually.
3. Elastic feeding and pull into the Ultrasonic welding.
4.Open the main machine slowly,then start to welding and cutting.
D Maintenance
1.Please start the ultrasonic welding equipment before open the main machine to avoid the superimposed load damage the ultrasonic equipment.
2.Adjust the ultrasonic mould pressure,too big may burnout it,too small may press unwell.
3.The pulling should be in balance when elastic feeding,or it may follding unwell.
E Advantages
1.This machine has Iron alloy rack and will not get rusted permanently.
2.One Machine can do plastic cap + Non-woven cap .Can do 3 size Cap no need change machine parts
3.With imported brake and motor,it has low noise.
4.With ultrasonic welding,automatically controls tension.
5.With no manual operation from feeding materials.
F Company profile:
We have more than 20 years experience in making equipment of disposable medical covers and health products. We have more than 2 invent patent, and 10 new design patent.
We have the best price, the best technology, can provide you with what you want.We are specialized in making protective products equipment such as shoes cover machine / bath cap making machine / anti-dust cover making machine / doctor cap making machine and so on!
If you have any needs, you are welcome to consult.
G TERMS & CONDITIONS:
- One Month
- Effected within 30 days from the date of signing the purchase contract and receipt of T/T affected for advance payment.
- Ningbo Port
- Effect payment by T/T in two installments exactly 30% advance payment and remaining 70% payment before shipment
- 100% brand new
- China.
-Wooden Pallet Packing
-Installation and Adjusting: If required, the seller will dispatch the technician to your country for installation, adjusting the machine and training the workers at your plant. This price is inclusive of the fee of installation and debugging. However the buyer should take on all costs required during our technician’s stay in the buyer’s country, including round airplane tickets, accommodation, and food .
O FAQ
Question | Answer |
1. How long will your engineer reach our factory? | Within one week after machine arrival your factory. |
2. How many days will you finish installing? | We will finish installation and training within 15days. |
3. What should we charge for your engineer? | You should charge for the cost of our engineer's visa, air tickets, hotel, food, and also their salary 100USD one day per person. |
4. How long is your machine's warranty period? | All our machine have one year guarantee, starting from finished installation. |
5. How could we do after one year warranty period? | We also can do service for you, but you need pay salary for my technician 100USD/day. |
6. How could we do if the parts broken within warranty? | We would express the free replacement parts during the warranty date. |