PP Plastic Molded Parts , Injection Molded Parts With Secondary Process

Brand Name:CM
Certification:ISO9001, ROHS
Model Number:CMC-008
Minimum Order Quantity:1000 Pcs, Negotiable
Delivery Time:4 weeks, Negotiable
Payment Terms:Western Union, L/C
Contact Now

Add to Cart

Active Member
Location: Dongguan Guangdong China
Address: No.19, Hesham Road, Shatou Southern District, Changan Town, Dongguan City, China.
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

Custom Injection Mold and Injection Molding Plastic Parts with Secondary Process


Our services included plastic injection mold building, injection molding, in-mold decoration, in-mold labeling and secondary processing. Injection molded plastic parts are widely use in many industry, such as household goods, office applications, automotive, medical device, consumer electronic, sports parts.


Plastic Injection Molding Service
Molding Type:injection molding, overmolding, insert molding, dual-color molding.
Production Material:ABS, PC, PP, PET, POM, PPS, PEEK, PMMA, PBT+GF, TPU etc.
Production Color:white, black, gray, red, pink, green, blue, yellow, silvery, purple etc.
Molding Machine:80T, 110T,140T,160T, 200T,260T,320T, 350T, 468T, 500T...
Application Area:medical, automotive, household, consumer electronics etc.
Lead Time:1 week to 4 weeks, according to the quantity.
Finish service and Assembly
Surface Treatment:spray painting, silk or pad printing.
Assembly:ultrasonic welding, after nut insert, assembly.
Packing:as you required.

Plastic Injection Mold Service
Drawing Format:STEP, STP, IGS, STL, CAD, PDF, JPG. (Sample is also accepted.)
Cavity Material:P20, 718, 2316, 2738, S136 etc.
Base Material:LKM, FUTA, HASCO, DME etc.
Surface Treatment:texture, high gloss polishing, mirror polishing.
Cavity:single and multi-cavity.
Runner:cold runner, hot runner.
Gate Type:side gate, sub gate, pin point gate...
Mold Life:5000 shots ~ 500,000 shots, according to your requirement.
Equipment:high speed CNC, standard CNC, EDM, wire cutting, WEDM, grinder etc.
Lead Time:25~60 days, according to the complexity and quantity.

China PP Plastic Molded Parts , Injection Molded Parts With Secondary Process supplier

PP Plastic Molded Parts , Injection Molded Parts With Secondary Process

Inquiry Cart 0