CE Heavy Duty 5-20 Ton Double Girder Gantry Crane Bridge Construction

Certification:CE
Minimum Order Quantity:Negotiation
Delivery Time:45 workdays
Payment Terms:L/C, T/T
Place of Origin:Henan,China
Price:Negotiation
Contact Now

Add to Cart

Verified Supplier
Location: Xinxiang Henan China
Address: No.1,Wei'er Road, Changyuan Crane Industrial Park, Xinxiang City, Henan Province.China
Supplier`s last login times: within 35 hours
Product Details Company Profile
Product Details

CE Double Girder Heavy Duty Gantry Crane Bridge Construction


Introduction:


Double girder gantry crane composed of gantry, crane crab, trolley traveling mechanism, cab and electric control system, the gantry is box-shape structure, the track is at the side of each girder and the leg is divided into type A and type U according to user’s requirements. The control method could be ground control, remote control, cabin control or both, in the cab there are adjustable seat, insulating mat on the floor, toughened glass for the window, fire extinguisher, electric fan and auxiliary equipment such as air condition, acoustic alarm and interphone which can be furnished as required by users. This double girder gantry crane is beautiful design and durable and widely used in open-air warehouse, of course, also can be used indoors, but please let us know the condition in your workshop, just tell us your demands, we can design the most suitable crane for you.


Technical Parameter:


Capacity (ton)51016/3.220/532/550/10
Span (m)18, 22, 24, 26, 30, 35
Lifting height (m)10, 11, 12
Working classA5
Control wayCabin control or remote control
Power source380V 50HZ 3phase (Could supply it as yours)
Trolley lifting mechanism

Lifting speed

(m/min)

Main hook11.38.57.97.27.55.9
Auxiliary hook--14.615.415.410.4
Trolley traveling mechanism
Traveling speed (m/min)37.335.636.636.63736
Crane traveling mechanism
Traveling speed (m/min)37.339.737.339.739.438.5
Motor power(KW)40.8-51.841.5-52.880-7784-8199.3-117.3126.5
Rail track recommended43kg/m43kg/m or QU70

Advantages:


1. Module control speed, micro-speed and double speed;

2. Traveling and lifting smoothly;

3. The power for trolley moving adopts flat cable, sliding smoothly;

4. Control box layout is reasonable, easy to repair;

5. Protection class IP55;

6. Optional main power source ;

7. All external cable line number with mark;

8. Safety smooth touch line, high conductivity, small pressure drop;

9. Light weight, installation convenience;

10. Set electric taxi speed is high, ensure continuing power supply;

11. Optional speed control module, and can realize the micro speed and double speed.


How to choose:


1. Selection of gantry crane

2. Span and cantilever length

3. The principle of determining the wheelbase

4. The gantry crane spacing size is determined


Photo:



China CE Heavy Duty 5-20 Ton Double Girder Gantry Crane Bridge Construction supplier

CE Heavy Duty 5-20 Ton Double Girder Gantry Crane Bridge Construction

Inquiry Cart 0