

Add to Cart
Orange Peel Checkered Stainless Steel Foil Engine Thermal
Insulation Mater
Name | Orange Peel Checkered Stainless Steel Foil Engine Thermal
Insulation Mater |
Grade | 304,316L,etc. |
Standard | JIS, AISI, ASTM, DIN, SUS,etc |
Dimension | 500mm or Custom size |
Finish | Embossed |
Color | None |
Application | Automotive , Insulation materials |
Lead Time | 12 to 20 working days after the receipt of 30% deposit |
Payment Terms | 30%TT for deposit, 70% balance before shipment or LC at sight |
Packing | PVC/PE Film + Waterproof Paper + Wooden Pallet or according to
customer's request |
Introdution
Thickness from 0.05 to 0.1mm ,
Grade 304 stainless steel foil
Embossed to coil.
Stainless steel orange peel pattern stainless steel foil, heat insulation material for auto parts.
Detail Image
Application
Packing And Loading
FAQs
Get answers to all your questions fast here from our Frequently
Asked Questions.
Q:How can I get some samples?
A:Catalogue and most sample pieces are preparing for you already in
stock.
Customized samples will take about 5-7days. Please contact us for
further support.
Q:What is the MOQ?
A:If you are scheduling to place a small quantity order or trial
order, feel free to contact us, we can meet your requirements.
Q:Can you OEM or ODM?
A:Yes, we have a strong developing team. The products can be made
according to your request.
Q:How long Can You Guarantee for this product/finish?
A:Colors guarantee for more than 10 years. Original materials
quality certificate can be provided.
Q:What kinds of payment methods do you accept?
A:We accept the payment by T/T or L/C, besides, you can transfer to
our bank account, Western Union or PayPal.
Q:What is the average lead time?
A:For samples, the lead time is about 5-10 days.
For mass production, the lead time is 10-25 days. In all cases, we
will try best to accommodate your needs.
Q:Can you supply the relevant documentation?
A:Yes, we can provide most documentation such as Inspection
Certificate/Mill Test Certificate, Insurance, Certificate of
Origin, SASO, Form E, and other export documents what required.