Add to Cart
JIGUO AF-3300B Folder Gluer For Two-Pieces Joint Corrugated Box/Folder Gluer Machine
The folder gluer machine is suitable for folding and gluing cartons,both cardboard and corrugated cardboard are ok.
Features
1.Semi-automatic press folder gluer machine is developed to give
companies the flexibility to produce short runs of any shape boxes,
quickly and easily.
2.The machine is set-up and ready to start making boxes in seconds.
3.The machine just need small place, easy to operate, only minimal
training required, no need for skilled labour. Change from one
design box to nest in seconds, ideal for small batch production and
variety of replacement.
4.Save glue, just need 1/3 glue than manual gluing.
Specifications
PARAMETER | |
Model | AF-3300B |
Max.paper size | 1650*1060mm (1650*1650mm) |
Min.paper size | 480*350mm |
Max. working speed | 3000s/h |
Power | 11KW |
Sheet thickness | A-E Corrugated board, 5 layer |
Total Weight | 3500KG |
Machine Dimension | 4500*5400*1460mm |
Feeding section
1. Friction feeder, equipped with two separate motor independent
drive, side panel width can be fine-tuned, with 3 adjustable
Feeding knife and 3 small Feeding knife, there are 8 rubber tape
which contains 4 suction belt, two separate control, retractable
rear support can be eused.
2. Glue part: to match the glue itself, the use of three groups of
plastic system to ensure that the finished product qualified rate
of 100%, double-slot flow of plastic road, to ensure the loss of
glue invalid, improve costs, easy to disassemble, easy to clean
double pieces carton gluing machine.
3. Conveying part: Using of whole process close to the
synchronization technology to ensure that the paper in the fast
transport
process does not run away.
4. Paper part: the use of photoelectric automatic sensor system,
high sensitivity, to ensure that the machine speed block.
5. Pressed part: the use of three groups of cylinders and
photoelectricautomatic sensor system to ensure consistency and
smooth.
6. Operating system: the human touch screen for the operation
center and PLC connection will be warning, detection of fault,
abnormal conditions and operating speed and other information
displayed on the screen, at a glance, and can detect maintenance,
work records, online real-time view of timely processing, truly
reflect the efficiency.
7. Electrical system: the use of well-known brands at home and abroad, in accordance with the European CE standard design, careful manufacturing, to ensure that the whole stable, high efficiency, low failure.
FAQ
Q1: Are you a manufacturer or a trading company?
A: We have our own factory in Tangshan, Hebei Province.
Q2. What is the machine warranty?
A: One year. After the warranty, we still provide technical support
to buyer at low cost.
Q3. What is the production time while placing order?
A: Normally about 20-30 days.
Q4. What is the delivery time?
A: 35-50days after deposit.
Q5. Can your company handle shipping for customers?
A: Yes, just give us destination sea port or container yard.
Q6. Does the packing strong?
A: Yes. Adopts moisture-proof and shock-proof packaging which is
suitable for long-distance road transportation and various types of
weather conditions. A full set of maintenance and operation manuals
is included.
Q7. How about the machine installation and training?
A: 1) We provide training in our factory for free; 2) We can send
technicians (engineers) to your factory for installation and
training. You shall pay round trip air fare and accommodations,
plus each technician charges USD100/per day.
Q8. Do you have machines in stock?
A: For standard model, we have a large quantity in stock.For
special model,we need 20-30 days to produce for you.
Q9. How can you assure the machines' quality?
A: Each machine will be test running at least 24 hours before
delivery to assure the quality. And during the warranty, we will
give spare parts for free if machine has any problem.
Q10. Do you inspect machines or test running before packing?
A: Of course we do. We have QC department to debug the machine
before packing. If you want to use specific material to do the test
running, you need to pay for the cost of the material
Q11. What's the payment term?
A: T/T 30% in advance, the balance shall be paid before delivery.
Also accept payment by West Union or L/C at sight.
Q12. Do you accept factory visiting?
A: Warmly welcome for your visiting.
Q13. How many years are you in printing field?
A: JIGUO factory is more than 20years.