OEM ODM Plastic Injection Moulds CNC Millings Grinding EDM Machines

Brand Name:Customized
Certification:IS9001, ISO/TS16949, EICC, and Dun & Bradstreet certification
Model Number:Custom made
Minimum Order Quantity:5PCS
Delivery Time:25 work days
Payment Terms:L/C, D/A, T/T, D/P, Western Union, MoneyGram
Contact Now

Add to Cart

Site Member
Location: Shenzhen China
Address: No.18,Youmagang Industrial Zone, JiangShi Village Gongming Town, Bao'An District Shenzhen City, China
Supplier`s last login times: within 30 hours
Product Details Company Profile
Product Details

OEM ODM Plastic Injection Moulds CNC Millings Grinding EDM Machines


Customized Rapid Prototype Mould OEM/ODM Plastic Products Injection Molding For Small Molded Parts


Mould Structure
Injection mould
Shaping Mode
Plastic injection mould
Mould material
P20,P20HH,718,718H,718HH,738,NAK60,NAK80,S136,2738,2344,2083,2316,H11,H13,SKD61
Product Material
PP, PC, PA6, PA66, PPS, PC/ABS, PS, POM, PE, PU, PVC, ABS, PMMA, etc
OEM/ODM
Acceptable
Certification
ISO9001:2015
Design software
3D Pro/E,UG,Solidworks;2D AutoCAD,CATIA
Mould life
200000-1000000 shots
Mould base
HASCO,DME,CHINA LKM STANDARD,PUNCH,YUDO
Mold making
Based on drawing or samples
System of Runner
Cold or hot runner
Surface Treatment
Spraying, chrome plating, screen printing, leather grain




FAQ:

Q1: Are you trading company or manufacturer ?
A: We are 100% direct factory, having our own's factory buildings and equipment.Welcome to visit us at any time.

Q2: How do you control the quality?
A: (1)Material inspection--Check the material surface and roughly dimension.
(2)Production first inspection--To ensure the critical dimension in mass production.
(3)Sampling inspection--Check the quality before sending to the warehouse.
(4)Pre-shipment inspection--100% inspected by QC assistants before shipment.

Q3: How about the lead time?
A: Generally, 1-2 weeks for samples, 3-4 weeks for mass production.

Q4: Can I get a quote without drawings?
A: Sure, we appreciate to receive your samples, pictures or drafts with detailed dimensions for accurate quotation.

Q5: Is it possible to know how are my products going on without visiting your company?
A: We will offer you DFM report and send weekly reports with digital pictures and videos which show the machining progress.

Q6: What is your payment terms?
A1: Mold Payment: 40% deposit by T/T in advance, 30% second mold payment before sending out the first trial samples, 30% mold balance after you agree the final samples.

A2: Production Payment: 50% deposit in advance, 50% before sending out the final goods.


China OEM ODM Plastic Injection Moulds CNC Millings Grinding EDM Machines supplier

OEM ODM Plastic Injection Moulds CNC Millings Grinding EDM Machines

Inquiry Cart 0